Loading...
HomeMy WebLinkAboutWorking Supvr Report Nov 04.pdf REPORT OF PUBLIC WORKS December 20, 2004 TO: BOARD OF TRUSTEES FROM: Ed Quick, Working Supervisor PERIOD: November 2004 REPORT BY DEPARTMENT: 1. PUBLIC WORKS a. Street System: We finished all the paving on Klinewoods and Hanshaw Roads. The Tompkins County Highway Dept. brought their shoulder machine in to put gravel in. b. Storm Water System: We have been keeping the catch basins cleaned of leaves. c. Water System: No Report d. Sewer System: No Report e. Solid Waste: We had 21 UFPO’s ~ DSNY. There is a copy of one on the back of this report so everyone can see what they look like. i. Equipment: DPW Fuel Consumption for the month: Gas = 164.60 Diesel = 1253.30 f. Buildings and Grounds: We have been cleaning up the yard that has accumulated stuff over the summer, such as a huge dirt pile, old melted pipe, etc. g. Personnel: No report h. Safety: I’m waiting to hear from our new Insurance Company so I can set up a Safety Meeting.