HomeMy WebLinkAboutReport of the Public Works October 2004.pdfREPORT OF PUBLIC WORKS
November 15, 2004
TO: BOARD OF TRUSTEES
FROM: Ed Quick, Working Supervisor
PERIOD: October 2004
REPORT BY DEPARTMENT:
1. PUBLIC WORKS
a. Street System: We have been working on Klinewoods and Hanshaw
paving intersections and driveways and catch basins.
b. Storm Water System: No report.
c. Water System: The Parkway sewer line project has been put on hold for
now.
d. Sewer System: We had 24 UPFO’s to mark out and we had a sewer plug
up on Klinewoods Rd.
e. Solid Waste: We’ve had one leaf truck out since the 15th of October. The
brush is still going well.
f. Equipment: DPW Fuel Consumption for the month: Gas = 268.10
Diesel = 1672.70
g. Buildings and Grounds: No report
h. Personnel: No report.
i. Safety: No Report.