Loading...
HomeMy WebLinkAboutReport by Department 10/18/2004October 18, 2004 TO: BOARD OF TRUSTEES FROM: Ed Quick, Working Supervisor PERIOD: September 2004 REPORT BY DEPARTMENT: 1. PUBLIC WORKS A. Street System We patched Pleasant Grove Road with tar paper. The Klinewoods project is going well. All the drainage pipe is in and we are ready to pave. We are caught up on the smaller projects. B. Storm Water System No report. C. Water System — We had to replace two water valves on Triphammer Rd and Oak Hill Rd. that were leaking. We will be starting the Parkway Place water line on 10/18/04. D. Sewer System — There were 22 UFPO's to mark out. We had a sewer plug on Sheldon Road and we flushed a few sewer lines around the Village. E. Solid Waste Brush pickup is going well with just a few minor problems. Leaf season starts 10/15/04. F. Building and Grounds We poured the concrete floor in two bays and replaced three doors. We have two more bays to pour. G. Equipment: DPW Fuel Consumption for the month: Gas = 172.00 gl Diesel = 1,054.70g1. H. Personnel —No report I. Safety - No report