HomeMy WebLinkAboutReport by Department 10/18/2004October 18, 2004
TO: BOARD OF TRUSTEES
FROM: Ed Quick, Working Supervisor
PERIOD: September 2004
REPORT BY DEPARTMENT:
1. PUBLIC WORKS
A. Street System
We patched Pleasant Grove Road with tar paper. The Klinewoods
project is going well. All the drainage pipe is in and we are ready
to pave. We are caught up on the smaller projects.
B. Storm Water System
No report.
C. Water System —
We had to replace two water valves on Triphammer Rd and Oak
Hill Rd. that were leaking. We will be starting the Parkway Place
water line on 10/18/04.
D. Sewer System —
There were 22 UFPO's to mark out. We had a sewer plug on
Sheldon Road and we flushed a few sewer lines around the
Village.
E. Solid Waste
Brush pickup is going well with just a few minor problems. Leaf
season starts 10/15/04.
F. Building and Grounds
We poured the concrete floor in two bays and replaced three doors.
We have two more bays to pour.
G. Equipment: DPW Fuel Consumption for the month: Gas = 172.00 gl
Diesel = 1,054.70g1.
H. Personnel —No report
I. Safety - No report