HomeMy WebLinkAboutReport of Public Works Aug 2004REPORT OF PUBLIC WORKS
TO: BOARD OF TRUSTEES
FROM: Ed Quick, Working Supervisor
PERIOD: August 2004
REPORT BY DEPARTMENT:
1. PUBLIC WORKS
a. Street System: We have been working on the Klinewoods Project and we
have ben working on several small projects
b. Storm Water System: We are replacing the heavy grates on the catch
basins with new lighter ones around the Village.
c. Water System: We are preparing to do the new water line in Parkway
Place which is about 800 ft..
d. Sewer System: No report
e. Solid Waste: No report
f. Equipment: DPW Fuel Consumption for the month: Gas = 142.90
Diesel = 1123.20
g. Buildings and Grounds: No report
h. Personnel: I returned to work 8/17/04 and I have a lot of catching up to
do.
i. Safety: No Report..