HomeMy WebLinkAboutReport of Public WorksREPORT OF PUBLIC WORKS
TO: BOARD OF TRUSTEES
FROM: Ed Quick, Working Supervisor
PERIOD:
REPORT BY DEPARTMENT:
PUBLIC WORKS
a. Street Systems:
We patched the blacktop swale on Hanshaw Road from Forest
Drive to North Triphammer Road.
b. Storm Water Systems: VA&�J- 'P-oaJ
We put in drainage pipe at Winthrop. This is becoming a problem
because a lot of Village residents want this done and it is very time
consuming. We also cleaned all of the catch basins because of all
the rain we have had.
c. Water System:
We had two water breaks in the Village in the month of May, one
at 120 Sunset Drive, and one at 100 West Upland Road.
d. Sewer System:
We had 33 UFPO's to mark out. We flushed several more times in
our maintenance program. We also had to put in a new manhole at
Oakhill, the old one had caved in.
e. Solid Waste:
We did our spring brush pick up the first week of May, and have
been cutting brush wherever needed in the Village.
f. Equipment: DPW Fuel Consumption for the month:
Gas= 151.70
Diesel= 724.70
g. Buildings and Grounds:
No Report
h. Personnel:
No Report
Safety:
I will be scheduling more safety meetings in the next couple of
months.