HomeMy WebLinkAboutReport of Public Works 5/17/2004REPORT OF PUBLIC WORKS
May 17th, 2004
TO: BOARD OF TRUSTEES
FROM: Ed Quick, Working Supervisor
PERIOD: April 2004
REPORT BY DEPARTMENT:
1. PUBLIC WORKS
a. Street System: Pot Holes are being patched as needed throughout the
Village.
b. Storm Water System: We put drainage pipe in for two village residents,
one at Lisa Lane and the other at Warwick Place. We have also been
doing some ditching around the village.
c. Water System: We repaired two broken water valves on Midway and
Lenox.
d. Sewer System: 26 UFPO'S were done this month and we have done our
Sewer Line Flushing Maintenance Program for two weeks.
e. Solid Waste: We are changing the garbage routes from 4 days a week to
2 days a week. Garbage will now only be picked up on Tuesday and
Thursday. We are also changing the yard and bulky pickup from twice a
month to once a month.
i. Equipment: DPW Fuel Consumption for the month:
Gas= 229.10 Diesel = 709.70.
f. Buildings and Grounds: No Report.
g. Personnel: Chong You came back to work on April 50, 2004 and is back
to full duty.
h. Safety: No report