Loading...
HomeMy WebLinkAboutReport of Public Works 12/15/2003REPORT OF PUBLIC WORKS December 15, 2003 TO: BOARD OF TRUSTEES FROM: Ed Quick, Working Supervisor PERIOD: November 2003 REPORT BY DEPARTMENT: 1. PUBLIC WORKS a. Street System: We didn't do much street work other than patch holes around the Village. b. Storm Water System: We put in drain pipes at 523 The Parkway for a Village resident at their cost, and ditched the property at 101 Warwick Place. We have been cleaning catch basins every week. c. Water System: There was a serious water leak at 615 Highland Road which saturated their property. It turned out to be the service going to 400 Hanshaw Road which Mancini & Ferrara has since fixed. d. Sewer System: We had 7 UPF)'s to mark out and 2 sewer inspections in November. e. Solid Waste: We did the fall pickup of brush the first weeks of November. We had 2, three man crews on leaves all month and we're about done with leaves. f. Equipment: DPW Fuel Consumption for the month: Gas = 139.80 Diesel = 727.20 g. Buildings and Grounds: We cleaned the old garage area so we could bring in equipment for the winter and repaired the roof which was leaking. h. Personnel: No report i. Safety: We scheduled a safety meeting for 1/21/04.