HomeMy WebLinkAboutWorking Supvr Report091503.pdf REPORT OF PUBLIC WORKS November 14, 2003 TO: BOARD OF TRUSTEES FROM: Ed Quick, Working Supervisor PERIOD: October 2003 REPORT BY DEPARTMENT: 1. PUBLIC WORKS a. Street System: No Report b. Storm Water System: We finished Highland Park Lane’s drainage problems. We put in new driveway pipes at 4 Highland Park Lane and finished ditching. We had two other drainage problems, one at 1109 Triphammer Road and one at 206 East Upland Road that we fixed. c. Water System: I contacted Jack Rueckheim at SCLIWC to see if they had any repairs on the system to be done. He gave me a list, a lot of work was replacing some water lines, which needs to be addressed. We did repair a few water valves. We also had a water break at the sewer plant. d. Sewer System: We had to repair a sewer manhole, lid and cover at 207 East Upland which was crushed by heavy vehicles. We had 47 UFPO’s to mark out and 5 sewer inspections. e. Solid Waste: We started our leaf collection on the 21st of October. We started late because of the wind storm on the 15th which knocked down several trees and limbs. It took a few days to pick it all up. i. Equipment: DPW Fuel Consumption for the month: Gas = Diesel = f. Buildings and Grounds: g. Personnel: h. i. Safety: