REPORT OF PUBLIC WORKS
November 14, 2003
TO: BOARD OF TRUSTEES
FROM: Ed Quick, Working Supervisor
PERIOD: October 2003
REPORT BY DEPARTMENT:
1. PUBLIC WORKS
a. Street System: No Report
b. Storm Water System: We finished Highland Park Lane’s drainage
problems. We put in new driveway pipes at 4 Highland Park Lane and
finished ditching. We had two other drainage problems, one at 1109
Triphammer Road and one at 206 East Upland Road that we fixed.
c. Water System: I contacted Jack Rueckheim at SCLIWC to see if they had
any repairs on the system to be done. He gave me a list, a lot of work was
replacing some water lines, which needs to be addressed. We did repair a
few water valves. We also had a water break at the sewer plant.
d. Sewer System: We had to repair a sewer manhole, lid and cover at 207
East Upland which was crushed by heavy vehicles. We had 47 UFPO’s to
mark out and 5 sewer inspections.
e. Solid Waste: We started our leaf collection on the 21st of October. We
started late because of the wind storm on the 15th which knocked down
several trees and limbs. It took a few days to pick it all up.
i. Equipment: DPW Fuel Consumption for the month:
Gas = Diesel =
f. Buildings and Grounds:
g. Personnel:
h. i. Safety: