HomeMy WebLinkAboutReport of Public Works 5/1/2001 to 5/31/2001Village of Tapp Eeigl2ts MARCHAM HALL 836 HANSHAW ROAD ITHACA, N.Y. 14850 REPORT OF PUBLIC WORKS TO: BOARD OF TRUSTEES FROM: Brent A. Cross, Superintendent of Public Works ' PERIOD: 5/1/01 through 5/31/01 REPORT BY DEPARTMENT: Telephone 607 - 257 -1238 Office Hours 9 A.M. - 4 P.M. I will not be able to attend the regular Trustee meeting this month because I will be away for vacation from 616 to 6/23. 1 think that this is only the second meeting that I have missed in almost 8 years. If you have any questions, please call me @ 257 -5536. A. VILLAGE ENGINEER - 1. PUBLIC WORKS Street System: Work has continued on the Highland Road reconstruction project. Most of the drainage and sewer main work has been completed on the 400 -500 block. When that section is completed, work will move to the 300 block. The tentative schedule for the rest of the work is for the asphalt base work to be done by the end of July, new curbing to be installed in early August and final paving by the end of August. 1 have prepared a public bid for the new granite curbing for the Highland Road project. I expect to have the bids back for award in the July Trustee meeting. Mike Zona and Jeff Frisbie went to observe a used "hot asphalt" trailer at the NYS Thruway Authority in Albany. b. Storm Water System: no report c. Water System: There is water come up through the edge of the pavement near the Kendal driveway. There is no previous history of a groundwater problem at that location, so there is a concern that it may be a leak from the Bolton Point transmission main. We will be excavating a "weep" trench to drain the free water, but are waiting for Bolton Point to obtain the proper repair parts so that that can work on it in case the problem is a leak in the pipe. d. Sewer System: Most of the sewer main pipes and manholes in Highland Road have been replaced in preparation for the reconstruction of the road. e. Solid Waste: Garbage collected for this month was tons. f. Equipment: DPW Fuel Consumption for this month: Gas = 662.90 gallons Diesel = 719.40 gallons The new John Deere backhoe has been delivered. The crew has commented that it is a very good machine and that they are glad to have it. As reported last month, we are looking into purchasing a "hot" asphalt trailer. The NYS Thruway has one that is going to be sold at an equipment auction in late June. Since this is an auction of public equipment, I believe that it meets the requirements for procurement. I will be on vacation at the time of the auction, so i will send Mike & Jeff to bid on the unit. I have instructed them not to bid over $2,500. This is an amount that can be covered in the current budget without additional funds being approved. g. Buildings and Grounds: Although they are not completed, I have preliminary drawings of the proposed new salt storage structure (see attached drawings). I intend to have the bids back before the next meeting for award of contract. h. Waste Water Treatment Plant: NYS SPDES Report for this month: Daily avg. flow was 1.606 mgd Max. avg. flow was 2.065 mgd w/ 0 permit exception(s) There have been 2 more meetings of the group for the integrated sewer project. They have decided to call the group the "Intermunicipal Sewer Committee ". They have received a copy of the resolution passed last month that authorized the Mayor to sign the SEQRA contract, but not until the intermunicipal agreement has been negotiated. Some of the ISC members are concerned about the delay of signing the agreement and requested that they be allowed to address the Trustees at the Special Board meeting to discuss the partnership proposal. I. Personnel: Mike Newhart is still off duty on Workers Compensation, while receiving full salary from the Village. There have been two more negotiating sessions with the Teamsters. There has been good progress. j. Safety: no report 2. Planning Board Reviews: a. Site Plan Approval: none b. Subdivision Approval: There has been an application by Tom McCarthy for subdivision of his house lot on N. Sunset Drive. This is a "preliminary meeting" which the purpose is to determine if the proposal meets the Zoning Regulations and to classify the subdivision as minor or major. 1 have reviewed the sketch of the proposed lots and determined that the lots meet the requirements for minimum size, and the remaining house lot also meets the other "bulk" regulations. The proposal does not qualify as a minor subdivision, and therefore will require that a Public Hearing be scheduled before final approval can be granted. 3. Ithaca /Tompkins County Transportation Council — a. Planning Committee:. b. Initial Project Proposals: none c. NYSDOT Projects: none B. ZONING OFFICER - (see attached report for Zoning Permit Activity) 1. ZBA Actions: none 2. Zoning Enforcement Actions: none C. BUILDING COMMISSIONER - (see attached report for Building Permit Activity) Owner: village of Tautzgn Rogllts ItT MARCHAM HALL 836 HANSHAW ROAD ITHACA, N.Y. 14850 APPLICATION FOR ZONINGIBUILDiNG PERMIT be filled out by Applicant) NO. Telephone 607 - 257.1238 Olfice Hours 9 A.M. - 4 P.M. Location: 7–L r -kA ir, ( Contractor. h, Y;1¢ 271L Phone :_,Z7.1.2 2,V1 To be Used For: The undersigned hereby applies for permission to do work as described Village of Cayuga Heights, NY, or others having Jurisdiction, and affirms Applicant has read and understands permi8ee obligations as explained !� Date: "P' 0 Signe Value of Construction: . In occordance with provisions or the Zoning Ording% ce nd other Laws and Regulations orthe the statements and information given herein ate c6recl to the best or his/her knovdedge. PART TWO (ro be filled out by Zoning /Code Enforcement ZONING INFORMATION Section 1 -4. ZONING DISTRICT:[ Section 5. HEIGHT OF BUILDING Section 6. YARDS: Front .2 Section 7. BUILDING COVERAGE: E Section 8. PORCHES, DECKS, AND Section 9. FENCES AND WALLS:_ Section 10. BUILDING FLOOR ARSE Section 11:16.OTHER (specify)_ Section 17. SIGNS: BUILDING INFORMATION (per Uniform Code) _ARTICLE 1 General Provisions _ ARTICLE 2 Occupancy and Construction i Section 701.1 General Classification by Section 704.1 Construction Classificatic Section 7051 Height and Fire Area: Other Code Review Required: (see at i _ARTICLE 3 One- and Two -Fa wellin _ ARTICLE 4 Multiple Dwel ' s _ ARTICLE 5 Genera t ding Construction _ ARTILCE 6 POWAssembly land or U.., Tax Parcel No. Of . —Occupancy G _ by ARTILC truclural Requirements ART 8 -12 Others (specify) _ ILCE 13 Facilities for the Physically Handicapped VILLAGE ACTION I� ( ) Zoning Permit approved by date / fee paid W&�) () Zoning Permit denied under Section_ of Zoning Ordinance by date rd fee paid ( ) Zoning Permit approved by Zoning Boaof Appeals date fee paid ( ) Building Permit approved by date fee paid ( ) Building Permit denied under Section of Uniform Code by date fee paid zbz' 1111 g 3.3 N 1 \ 3 1.30 Ac 1 \ 1AQ s 1AAS O Vp T � \ 11 0 N 1 N I 1 s 11 ✓ y� N 1 1 35 s w s N 2. po .04 A N _ u I v I ❑231 s II � N 1.12 Ac C w � _ 4 1 \ / 2.1 �! ` . s 2.3 1.07 Ac C \\ I I I I � I I I I I I i t s I I I I 34 I�I I i rb 30 1 Ac I I I I IW�. 101 I I N I I- I I I I I I I 5 i wl • � I • I I I I I I I I I I I I I� I 1 1 1 I 11 11 1 1 1 1 1 \ E o \ zbz' 1111 g 3.3 N 1 \ 3 1.30 Ac 1 \ 1AQ s 1AAS O Vp T � \ 11 0 N 1 N I 1 s 11 ✓ y� N 1 1 35 s w s N 2. po .04 A N _ u I v I ❑231 s II � N 1.12 Ac C w � _ 4 1 \ / 2.1 �! ` . s 2.3 1.07 Ac C