Loading...
HomeMy WebLinkAboutBolton Point, Growth, Capital Projects, and 2015 Water Rate September 2014.PDFBolton Point, Growth, Capitalprojects, and 2015 Water Rate $eptember 2014 The 2015 proposed and Commission-ap!roved Bolton Point component of the water rate is 54.35/1000 gallons, an increase over 2dt+ of 6.6Yo. ln 20L3, there was a ZTyoincrease in thewater rate that followed a period of 16 fears during which there were no rate increases and, intwo years, substantial rate decreases. {uring those years, water rates were subsidized by thefund balance {essentially the difference assets and liabilities). Following the large 2013 rate ingease, the Commission future increases to be much more in line with increases in the consumer Price lndex (fet) trran was the 2013 increase. In 2014, this was the case, with a rate increase of Zyo and, for 2015, the Commission expects to tanding the relatively high percentage increase more frequent, but stable increases than thosethat were implemented from 1996 to L2. The proposed 2015 rate increase due mainly to components of the is significantly higher than that for the Cpt. This is over which the Commission has fittle control. These cCImponents, which make up g5% of t (27 total) in 2015, and retirement and increase, include electricity, an additional pay period th insurance costs. The 20L5 Commission'approved budget and proposed water rate will support the addition of an Assistant Production Manager (APM) position and new 24/7 Supervisory, Controland Data Acquisition (SCADA) system support,are discretionary items that are highly recommended by staff and for which th{ Commission has approved funding in ttre ZO1S budget. The APM position will support tfre Commission's succession planning, which is becoming increasingly important as key fnanagerial staff members approach retirement. The addition of an APM will increase the Corf mission staff to 2L, but the production Departrnent staffing levelwill return to the normal by attrition. The new Z4/7 SCADAsuppont is critical because it is specific to the new SCADA software to be installed this year. The SSADA system monitors and controls the operation of the water treatment plant and water transmission and distribution systems of the Commission and municipalities. The currenr support option is inadequate to meet outr ongoing needs. The 27o/o increase in 20L3 has allowed Bdlton Point to address deteriorating and failing infrasilucture through establishment of bn ongoing capital improvement/replacement project fund that reduces the need to borrow foi projects . ln Zor4,the commission intends to participate with the Village of Lansing to a section of transmission/distribution mainr parallel to the existing transmission mairi that crosses beneath NyS Route L3 in the Village by using this project fund without incurring the Commission if the existing Route 13 debt. This water main would be available to ng were to fail and necessitate a lengthy repair. The Commission continues to study to the 10,000 gallon/quarter minimum billing structure in order to ensure fairness and reward conservation while assuring that required revenue is generated. The Commission was created to and Commissioners believe that to meet both of those goals. For Manager, at 607 -277 -0660. the 2t more high quality water at the lowest possible cost. The staff rate increase is necessary to ensure that we continue please contact Jack Rueckheim, General October l.z01tr. The Cayuga Heights Fire Department Auction/Fundraiser on November l, 2104 to host the Cayuga Heights Elementary School's pTA Fall the Cayuga Heights Fire Station. As a condition for using Cayuga Heights Fire Department as an additional insureJ forthis facility, the PTA will add the Village r this event on its general lialility coverale.'"I,ffi/"' Chie{ Village of Cayuga Heights Fire Amy Schwartz Co-President, Cayuga Heights Elementary