Loading...
HomeMy WebLinkAboutWorking Supvr Report template.pdfREPORT OF PUBLIC WORKS TO: BOARD OF TRUSTEES FROM: Ed Quick, Working Supervisor PERIOD: July 2006 REPORT BY DEPARTMENT: 1. PUBLIC WORKS Street System: We have been cutting brush around street signs and for road clearance. We also cleaned ditches around the Village. We are starating Phase 2 on replacing old signs and posts around the Village. a. Storm Water System: We put in storm drainage pipe at 103 and 107 Hanshaw Road. We also put in culvert pipe across Randolph Rd. and East Upland Rd., with new catch basins. We also had Drain Brain come in and clean all the big catch basins which were plugged up. b. Water System: We cleared brush from around the water pits for Bolton Point. And we are preparing to repair several water valves. c. Sewer System: We plan on flushing a lot more sewer lines around the trouble spots in the Village. d. Solid Waste: Brush is still very heavy. e. Equipment: DPW Fuel Consumption for the month: Gas = Diesel = 668.46 f. Buildings and Grounds: Brush and dirt debris is still a problem on how/where to get rid of it. g. Personnel: We finally have a full crew! i. Safety: No Report