HomeMy WebLinkAboutReport of Public Works August 2010.PDFREPORT OF PUBLIC WORKS Thursday, Septembor 02, 2010 TO: BOARD OF TRUSTEES FFiOM: Jeffrey Frisbie; Asst. Superintendent Of Public Works PIF,RIOD: August 2010 RIIPORT BY DEPAR.TMENT: 1. PUBLIC WORKS a. Street System: we was able to complete the repairs needed on the parkway rd. We will be paving from Klinerryoods Rd to E. Upland Rd. 9/3/20 1 0. . . Highgate Rd. and other areas of The Parkway have been completed as well... we intend on installing the shoulders and doing the top soiling in September... b. Storm Water System: N.Sunset culMert pipe repair is under way and should be completed in Septemberi.. c. Water System: Our water system hbs been working well. And we have been working with Bolton point on maintenance that is needed... d. Sewer System: We have plans on fontinuing flushing... e. Buildings and Grounds: We have been continuously cleaning the yard as time allows. f. Personnel: nothing to report. g. Safety: nothing to reporl.,. DEPARTMENT OF PTIBLIC WORKS 123 Sheldon Rd. Ithaca,I{Y 14850 (607) 2s7-6166 Thursday, September 02, 20I 0 To: The Honorable Mayor Supron Members of the Board of Trustees Village of Cayuga Heights Re: Monthly Report- August 2010 During the month of August we have been able to finish the paving on Highgate Rd., and The Parkway except for the area between Klihewoods and E.Upland Rd. which needed minor repairs prior to putting a top on... \Ve plan on having that area paved 91"312010... We also have taken over the culvert pipe projdct on N.Sunset Rd., and have finished the Inlet wall which has allowed us to start backfi[ling... we also have finished the sewer line installation as well... This will be a little timd consuming but should be done in the month of September... Are goal for September is to have all the pavfng as well as the shoulders and top soiling done in September... as well as the culvert pipe job too.. . we have other small jolbs needing attention and will address them as sdon as we get the larger projects completed... Sincerely; Jeffrey Frisbie Asst Supervisor DPW