HomeMy WebLinkAboutDPW Monthly Report- Jan 2010.PDFDEPAR Monday, February 01, 2010 llo:The Honorable Mayor G Members of the Board Village of Cayuga Hei R.e:Monthly Report- Janua During the month of Januhry we bus project, we also poured the hand TCAT to install a shelter for in cli We also cornpletely been picki and have addressed all signage needi working to keep the roads clear duri flushing in problem areas...we also completed the pickup as prornised... Also during January we started public concerns for the upcoming Sincerely; Jeflrey Frisbie Asst Supervisor DPW OF PTIBLIC WORKS Sheldon Rd. NY 148s0 7) 2s7-6166 lmore Trustees 2010 able to install the temporary pad for the TCAT accessible sidewalk atthat site too. That enables weather... up Christmas trees and chipping them up for mulch. g repalrs... our snow teams have been diligently emergency call in's.. And have done some sewer able to help in the recycling issues and ng our spring projects and have taken some work... TO: FROM: PERIOD: January 2010 REPORT BY DEPARTMENT: 1. PUBLIC WORKS Monday, February 01 BOARD OF TRUSTEES Jeffrey Frisbie; Asst. Superintendent 2010 f Public Works a. Street System: We have also install b. Storm Water System: Our system cleaning. c. Water System: Our water system has d. Sewer System: We have plans on minor break... Buiidings and Grounds: We have time allows. Personnel: you will notice overtime d conditions due to snow... Safety: nothing to report... a temporary pad for a shelter to be and poured a handicap accessible been working well with periodic working well. ng flushing. And repaired I continuously cleaning the yard as to numerous call inn's for road installed at the TCAT bus stop proj ramp to connect the sidewalk... our have been called in several times for snow removal and saltins...