Loading...
HomeMy WebLinkAboutDPW Monthly Report- Sept 2010.PDFDEPARTMENT OF PTIBLIC WORKS 123 Sheldon Rd. Ithaca, NY 14850 (607) 2s7-6166 We also have been able to finish the culvert plpe and get the road backfilled for thru traffic... we have a few minor repairg to complete to finish it off completely... Monday, October 04, 2010 To:The Honorable Mayor Supron Members of the Board of Trustees Village of Cayuga Heights Re: Monthly Report- September 2010 During the month of September we have beenl able to complete the shoulders and top soiling work for the paving... we have also addrebsed signage on these roads as well... Sincerely; Jeffrey Frisbie Asst Supervisor DPW REPORT OF PUBLIC WORKS Monday, October 04, 2010 TO: BOARD OF TRUSTEES FR,OM: Jeffrey Frisbie; Asst. Superintendent of public works PERIOD: September 2010 REPORT BY DEPARTMENT: 1. PUBLIC WORKS a. Street System: we was able to complete the paving as well as the top soiling and shoulders, on the capitdl projects... b. Storm water system: N.Sunset culVert pipe repair is completed so that thru traffic is passible. i. c. Water System: Our wafer system has been working well. And we have been working with Bolton point on maintenance that is needed... d. Sewer System: We haye plans on {ontinuing flushing... e. Buildings and Groundq: We have bpen continuously cleaning the yard as tirne allows. f. Personnel: nothing to repoft. g. Safety: nothing to report..,