HomeMy WebLinkAboutReport of Public Works Nov 3, 2010.PDFFROM:
PERIOD:
REPORT B
1. PUB
REPORT OF PUBLIC WORKS
Wednesday, November 03, 2010
BOARD OF TRUSTEES
Jeffrey Frisbie; Asst. Superintendent Of public Works
tober 2010
DEPARTMENT:
C WORKS
Street System: we were able to complete the paving as well as the top
soiling and shoulders, on the capitol projects as well as stripping and
signage. we also have finished numerous other small jobs ihroughout the
village. .. we have started Leaf collection and are on schedule...
Storm water System: N.sunset culvert pipe repair is completed and are
awaiting the Guardrail installation in November... we also have repaired
various storm basins within the villase.
Water System: Our water system has been working well.
Sewer System: We have plans on continuing flushing...
Buildings and Grounds: we have been continuously cleaning the yard as
time allows. we have begun preparing all the equipment for the upcoming
snow season...
Personnel: nothing to report.
Safety: The crew is in the process of learning and obtaining their Fema IS-
100 certificates on Emergency Response...
Wednesday,
DEPARTMENT OF, PTTBLIC WORKS
123 Sheldon Rd.
Ithaca, NY 14850
(607) 2s7-6166
ovember 03,2010
Honorable Mayor Supron
rbers of the Board of Trustees
llage of Cayuga Heights
nthly Report- October 20i0
During
n:::i: i*:::r,":. y:j,5, I ::1, ugr. to, fo cus our attenti on on nni shi ng up
projects have : ::ti, I: lg" *1"": ll: 1i t t ae3
1rra1
we had'
"r'"
i"r
"
J urt". irre capito I,qP\LIfinished..-. the majority olthe jobs requiring blacktof r,uu.i""r,
R.e:
To:
numerous
completed,
seeding has
the Temps it
prior to snow
Overall
for leaf pi
the much
Jeffrey Frisbie
Asst Suoervi DPW
The si 5::: T::_:^l'l-llfrush {i1m1ns went very well this year with only Iresidential/ r Lrr vruJ Ilaint. Leaves have been picked u! on schedule and with the addition of
*:l*:i"* g:::::_:treied, signage h", t;;;-"il;,#;,", *iing unan completed, along with numerous other small jobs...
allowed our crew to restart our sewer maintenanc. unJ t op.fully finish
in General with the Boards approval of alrowing us to utilize the temps
ltlf^g*:lly helped by allowing our more skinld emproyees take care ofrepair work and normally scheduled maintenance...