HomeMy WebLinkAboutEstimate based on Kendal PurchasingContributing Materials and the Village DPW providing Labor & Equipment.PDFCOST ESTIMATE
CROSSWALK @ KENDAL
This estimate is based on al purchasing/contributing materials and the Village DPW providing labor & equipment'
TERI QUIP
remove/d isPose asPhalt
excavate trench
install conduiUwire for lamP
new lamp Post
dry mix concrete bedding
new granite curbing
wet mix concrete backing
gravel backfill
asphalt patching
topsoiland seeding
new signage
new crosswalk line striPing
other
700 sf
100 rf
100 lf
1ea
5cy
100 rf
5cy
10 cy
5 ton
500 sf
8ea
75lf
allowance
na
na
125.00
250.00
250.00
2,000.00
250.00
250.00
500.00
125.00
750.00
250.00
250.00
c
$
$
q
c
q
$q
4
o
4
4
4
4
4
8
'16
6
8
4
4
oemo saw
backhoe
mini backhoe
backhoe
subcontractor
subcontractor
subcontractor
plate tamper
roller
dump truck
post driver
torch
misc
hourly rate (inc P/r tax & oh)
estimated labor cost
fuel & maintenance
$ 50.00
$4,000.00
$1,000.00
$506il00- vi I lage Contri b utio n
Our past practice has been
cost, the Trustees would tt
Insraffea claim
Mary Mills
From: JeffreY Silber
Sent: WednesdaY,
To:
Gc:
Subject: RE: Ingraffea
PRIVILEGED ATTORN
At our next meeting, in
by virtue of our Prior
considered a gift.
[Disclaimer that I
From: Brent Cross
1012712010
Page 1 of 1
27 ,2010 12:38 PM
Brent Cross; 'Marcus'
VCH-Trustees
tm
-CLIENT COMMUNICATION. Do not forward
:utive session, I would ask that Randy opine whether our liability is precluded
taw. tf so, I betieve 11ufg'e Village ian'not settle the claim as it would be
Tony Ingraffea is a friend with whom I worked for many years'l
submit these types of claims to our insurance. In the event that they don't cover the
need to Oecideif tfre claim should be paid directly'