Re: Monthly Report- May 2010
During the nrLonth of May we have been able to finish paving Hanshaw Rd and
Highgate Rd. from Highland thru Highgate Pl. Ws were also able to T&L the rest of
Highgate rd as well as doing the base stabilization, and The Parkway from Highgate Rd
to Klinewoods Rd., and The Parkway from E.Upland Rd to Highland Rd. this far
exceeded what rare anticipated being able to complete before June lt'. I am currently
working with Suit kote to schedule the grinding and completion of the paving... once the
paving is complerted we will schedule the stripping contractor to come in and complete
the project by stripping the roads as well as all the crosswalks and school zones
In addition to working on the capitol project we have also been working on the TCAT
bus stop project and feel that we are approximately 70oh completed... We also plan to
continue our yearly flushing of the sewer mains... We also have been able to maintain
our scheduled garbage collection as well as brush, bulky, and have also been doing the
rnowing...
Sincerelv:
Jeffrey Frisbie
Asst Supervisor IDPW
'IO:
FR.OM:
REPORT OF PUBLIC WORKS
Wednesday, June 02, 2010
B;OARD OF TRUSTEES
Jeffiey Frisbie; Asst. Superintendelrt Of Public Works
IPERIOD: May 2010
]REPORT BY D]EPARTMENT:
1. PUBLIC WORKS
b.
Street System: We have focused orlr attention on the Capitol paving
prroject and the TCAT bus stop... Suit Kote has done an excellent job and
hias completed the paving of Hanshaw Rd, Highgate Rd form Highland
thru Highgate Pl. They have also been able to complete the base
stabilization on Highgate Rd and have T&L The Parkway from Highgate
to Klinewoods Rd, and from E.Upland to Highland Rd, including the rest
o:f Highgate Rd... Our crew installed the asphalt curb on Hanshaw Rd to
control storm water. we have also been working diligently on the TCAT
br*s stop and are approximately 70o/o complete...
Storm Water System: Our system has been working well with periodic
cleaning. We have also completed all the ditching on the roads that were
pirved and everything appears to be working well...
S/ater System: Our water system has been working well.
d. Sewer System: We have plans on continuing flushing...
Buildings and Grounds: We have been continuously cleaning the yard as
tirme allows. We have been able to completely haul away all spoils at the
DPW site...
Pr:rsonnel: Wayne Ralyea has been a great addition as he has filled the
vacated Laborers position ...
Safety: nothing to repoft...ob.