Re: Monthly Report- June 2010
During the month of June we havp been able t! complete the grinding from E.Upland
Rd to Klinewoods Rd. Unfortunately we have fougrd some areas that will need to be
addressed fuither prior to applying thp final type 7 top layer... these are areas that were
undetected over the years, that the existing pavernent and base were too shallow and we
had ground thru the base material intd the clay mdterial... this has delayed our progress
slightly but we intend on working diligently to get this done ASAP.
In addition to working on the capitol project we have also been working on the TCAT
bus stop project and feel that we are {pproximatelf 90o/o completed... We also plan to
continue our yearly flushing of the se]rver mains... We also have been able to maintain
our scheduled garbage collection as ltell as brush, bulky, and have also been doing the
mowing...
Sincerely;
Jeffrey Frisbie
Asst Supervisor DPW
C WORKS
06,2pr0
TO:
FROM:
Tuesday, July
BOARD OF TRUSTEES
Jeffrey Frisbie; Asst. Superintendetrrt Of Public Works
PERIOD: June 2010
REPORT BY DEPARTMENT:
1. PUBLIC WORKS
b.
a. Street System: We ha*e focused orirr attention on the Capitol paving
project and the TCAT bus stop. Sdit kote has been able to grind the area of
the Parkway from E.Upland to Klipewoods Rd.the TCAT bus stop and are
approximat ely 90Yo cc]mnlete. . .
Storm Water System: Our system has been working well with periodic
cleaning. We have alsg completed all the ditching on the roads that were
paved and everything pppears to be working well...
Water System: Our w{ter system lias been working well.
Sewer System: We h{ve plans on continuing flushing...
Buildings and Groundi: We have been continuously cleaning the yard as
time allows. We have peen able to completely haul away all spoils at the
DPW site...
Personnel: nothing to report.
Safety: nothing to report...