kendalcrosswalk$.pdf
COST ESTIMATE CROSSWALK @ KENDAL This estimate is based on Kendal purchasing/contributing materials and the Village DPW providing labor & equipment. DESCRIPTION OF WORK QUANTITY MATERIAL LABOR EQUIP (mhr) remove/dispose asphalt 700 sf na 4 demo saw excavate trench 100 lf na 8 backhoe install conduit/wire for lamp post 100 lf 125.00$ 4 mini backhoe new lamp post 1 ea 250.00$ 4 backhoe dry mix concrete bedding 5 cy 250.00$ 4 subcontractor new granite curbing 100 lf 2,000.00$ 4 subcontractor wet mix concrete backing 5 cy 250.00$ 4 subcontractor gravel backfill 10 cy 250.00$ 8 plate tamper asphalt patching 5 ton 500.00$ 16 roller topsoil and seeding 500 sf 125.00$ 8 dump truck new signage 8 ea 750.00$ 8 post driver new crosswalk line striping 75 lf 250.00$ 4 torch other allowance 250.00$ 4 misc 5,000.00$ 80 total manhours (2 guys x 1 week) 50.00$ hourly rate (inc p/r tax & oh) 4,000.00$ estimated labor cost 1,000.00$ fuel & maintenance 5,000.00$ Village Contribution