HomeMy WebLinkAboutagenda Board of Trustees September 13, 2010VILLAGE OF CAYUGA HEIGHTS BOARD OF TRUSTEES CAYUGA HEIGHTS VILLAGE HALL September 13, 2O1O 7:OO P.M. AGENDA Call to Order Approval the Minutes of August g, 2OIO Motion to approve the minutes of Jury 19, 2010 as submitted. Approval the Minutes of September 7, 2O1.O Motion to approve the minutes of september 7,2010 as submitted Privilege of the Floor - 2 minute limit/person - 30 minutes totalVCH Residents speak first, balance of time to generar public Report of the Mayor - 2O minutes EiS Consultant TCAT Update Health consortium - Resolution authorizing the Mayor to sign theTccoc Municipal cooperation Agreement dated 7 /Lo/ro Resolution to set up public hearing for october 12 to hearcomment on proposal for a local law for alternate members for the planning Board and Zoning Board of Appeals. Resolution to set up public hearing for octob er L2 to hearcomment on proposal to amend local law adding a vet clinic to the list ofallowable uses in the residential district. Report of the Fire Supt. - 5 minutes ffiru \ Resolution authorizing to engage bond counsel for borrowingassociated with acquisition of a new tire engine. - 15 minutes Report of Ass't supterintendent of public works - 5 minutesResolution xxxx to approve the reruna or g5o to phil Hutchings forthe payment of an unnecessary permit at 3o9 E. uprand Road. Roo.Y Report of the police Chief - 5 minutes W N\"\"\ Report of the Clerk - 2 minutes Reminder - October Board meeting will be held on Tuesday, October 12 at the Fire Station due to October 11 holidaY. Clerk's office uPdate Report of the Treasurer - 1O minutes Approval of Abstract Resolution accepting the Court audit Resotution to approve emergency funds for culvert project on N. Sunset Dr. Resolution xxxx ratifying actions previously taken to enter into a time and materials contract with Paolangeli Contractors to provide emergency demolition of culvert/headwall on N. Sunset Drive Whereas, a large concrete headwall over a culvert on N. Sunset Drivb (within the Village ROW) was deteriorating and began to lean towards falling into the deep ravine below, and Whereas, to prevent the headwall from falling into the adjacent ravine and causing both an environmental impact, and a difficult and expensive repair/recovery, the Village needed to take action on an emergency basis to remove the headwall as soon as possible' Whereas, the Village DPW does not have the equipment necessary to safely perform the work of removing such a large piece of concrete that extends about 2(J' down into the ravine, and Whereas, Paolangeli Contractor is a local firm with equipment and expertise in the handling of heavy construction projects' and was available to begin work on this project immediately on a time and materials basis, with an estimated cost of $25'OOO to $35'OOO, and Now Therefore, the Board of Trustees of the Village of Cayuga Heights hereby deem the removal of the N. Sunset Drive Culvert/Headwall to be an emergency, which does not require the use of standard procurement process, and Therefore, the Trustees hereby authorize Paolangeli Contractor to perform the emergency work on time and materials basis for equipment and labor upto an amount not to exceed $35'OOO' and that an amount equivatent to the cost of this contract shall be transferred from A1990.41O Contingency to A511O.410 Streets Contract Expenditures. Report of the Attorney - 5 minutes Trustee Privilege of the Floor - 1O minutes Adiournment