HomeMy WebLinkAboutagenda Board of Trustees October 20, 2008.pdf
VILLAGE OF CAYUGA HEIGHTS
BOARD OF TRUSTEES
October 20, 2008
7:00 P.M.
Call to Order
Approval of Minutes of the Meeting of September 15, 2008 – 2 minutes
Privilege of the Floor – 2 minutes/speaker
Guidelines to be distributed
New Business – 15 minutes
NYCOM Meeting Procedures – Distributed – To Be Discussed
Report of the Fire Superintendent - Report Distributed - 5 minutes
Report of Chair of Public Safety
Report of the Mayor – 5 minutes
Ratification of the PBA Contract by the Trustees
NYCOM
Approval of Elizabeth Mount to Deer Remediation Advisory Committee
Appointment of Bea Szekely to Trustee position vacated by the death of Ann Antil
Deer Commentary
Other Business
Trustee Privilege of the Floor – 5 minutes per Trustee available
Report of the Clerk – 5 minutes
Marcham Hall Renovation – Report Distributed
Report of Ass’t. Superintendent of Public Works – Report Distributed - 5 minutes
Report of Superintendent of Public Works – 30 minutes
The Village has received a contract from NYSDEC to formalize the terms and conditions under
which they are willing to provide grants of $1,020,000 toward the construction of the Phosphorus
Improvement Project at the WWTP. A resolution is required (see attached draft) to authorize the
Mayor to sign the contract, which commits the Village to completing the project (already under
contract).
ACTION: Resolution to Authorize the Mayor to sign the contract with NYSDEC
Bids have been received for the Hanshaw Road water main replacement project. The bid for
materials is more than we have currently budgeted for this work. I will be discussing this
situation with Jeff Silber to see if there is an alternative source of funding.
ACTION: If a funding source is available, then I will be requesting authorization to proceed
with a purchase order for the materials and to hire the contractor to install the pipe.
We have received an engineering proposal from TG Miller Engineers to provide design services
for the Phase II Water Improvement Project. The original study identified 7,820 lf of pipe that
needs to be replaced. The preliminary cost estimate at $125/lf is $1,125,000 (including 15%
contingency). They are proposing to provide computer modeling, surveying, engineering design,
bidding and construction administration. Their services would be billed on an hourly basis with a
total fee not to exceed $98,000.
ACTION: Authorize the Mayor to sign the agreement with TG Miller Engineers.
Report of Police Chief – Report Distributed – 5 minutes
- Resignation of part-time police officer Ryan Mayo
Authorization to hire part-time police officer to fill position left vacant by Ryan Mayo’s
resignation.
Authorization to hire part-time police clerk to fill open position for 20 hours/week unless full
time police clerk is out of the office for a longer period of time.
Report of Treasurer – Report Distributed – 15 minutes
- Resolution approving Transfers
- Resolution approving Abstract of Vouchers
Old Business
Adjourn – 9:30 pm