HomeMy WebLinkAboutWorking Supvr Report Dec 04.pdfREPORT OF PUBLIC WORKS
TO: BOARD OF TRUSTEES
FROM: Ed Quick, Working Supervisor
PERIOD: December 2004
REPORT BY DEPARTMENT:
1. PUBLIC WORKS
a. Street System: Again, we have been patching holes around the Village.
b. Storm Water System: No Report
c. Water System: We are going to start the Parkway Place water line project
in the beginning of January.
d. Sewer System: We had 23 DSNY’s to mark out. We need to replace some
sections of sewer line that are in bad shape. I’m starting a sewer survey.
e. Solid Waste: We finished the leaves on Dec 20. We have a huge leaf pile
to get rid of.
f. Equipment: DPW Fuel Consumption for the month: Gas = 183.90
Diesel = 974.20
g. Buildings and Grounds: No Report
h. Personnel: -
i. Safety: We have scheduled a Safety Meeting in January.