REPORT OF PUBLIC WORKS
TO: BOARD OF TRUSTEES
FROM: Ed Quick, Working Supervisor
PERIOD: January 2006
REPORT BY DEPARTMENT:
1. PUBLIC WORKS
a. Street System: We continue to patch holes around the Village. This
hasn’t been too bad because of the mild dwinter.
b. Storm Water System: No Report
c. Water System: No breaks
d. Sewer System: We had 14 UFPO’s to mark out. We extended the sewer
main on Sheldon Road so the residents at 128 Sheldon Road could be
hooked up to it.
e. Solid Waste: The brush pick up has been pretty mild this year.
f. Equipment: DPW Fuel Consumption for the month: Gas = $59.70
Diesel = $1005.40
g. Buildings and Grounds: We have a big problem with dirt debris at the
Village barn. We have to find a place to dump it.
h. Personnel: No Report
i. Safety: No report.