Loading...
HomeMy WebLinkAboutReport of Public Works Dec 2005.pdf REPORT OF PUBLIC WORKS TO: BOARD OF TRUSTEES FROM: Ed Quick, Working Supervisor PERIOD: January 2006 REPORT BY DEPARTMENT: 1. PUBLIC WORKS a. Street System: We continue to patch holes around the Village. This hasn’t been too bad because of the mild dwinter. b. Storm Water System: No Report c. Water System: No breaks d. Sewer System: We had 14 UFPO’s to mark out. We extended the sewer main on Sheldon Road so the residents at 128 Sheldon Road could be hooked up to it. e. Solid Waste: The brush pick up has been pretty mild this year. f. Equipment: DPW Fuel Consumption for the month: Gas = $59.70 Diesel = $1005.40 g. Buildings and Grounds: We have a big problem with dirt debris at the Village barn. We have to find a place to dump it. h. Personnel: No Report i. Safety: No report.