Loading...
HomeMy WebLinkAboutPB Resolution 2024-013, 29.-1-18.2 TOWN OF ULYSSES PLANNING BOARD Planning Board Resolution No. 2024-013 A Resolution of Final Site Plan Approval of an Accessory Structure Located at 61 Maplewood Road,Town of Ulysses,Tax Parcel 29.4-18.2 WHEREAS, the Planning Board finds the following: 1. The proposed action is in consideration of an application for site plan review submitted by Mark Martinek, on behalf of the property owners Jeff and Nicole Woodring, for property located at 61 Maplewood Road, Tax Parcel 29.-1-18.2; and 2. The subject lot is zoned LS: Lakeshore zone and the proposed new construction is located within the Ro (Rock Outcrop)Steep Slope Overlay; and 3. The request is to construct a new deck and walkway approximately 445sf adjacent to an existing dwelling unit and concreate patio; and 4. The action is a Type II action under the Code, Rules, and Regulations of the State of New York Title 6, Part 617 (SEAR), Section 5.c.12 "construction, expansion or placement of minor accessory/appurtenant residential structures, including garages, carports, patios, decks, swimming pools, tennis courts, satellite dishes, fences, barns, storage sheds or other buildings not changing land use or density" and requires no further review; and 5. The action does not require 239 review per the Inter-Governmental Agreement made with Tompkins County 24 November 2003; and 6. Notice of final site plan review was posted on the Town's webpage and was mailed to property owners within a 500-foot radius of the subject property; and 7. The Planning Board on July 2, 2024, has reviewed and accepted as adequate a site plan map entitled "Survey Map No. 4 Maplewood Point& No. 61 Maplewood Road, Town of Ulysses, Tompkins County, New York", with delineated improvements, and other application materials; and 8. The Planning Board considered the review criteria listed in The Code of the Town of Ulysses, Chapter 212 Zoning, Section 19.E.2 against the proposed site plan as applicable; and 9. The Planning Board has determined that the applicant is in compliance with all other applicable provisions of the Zoning Code and other ordinances as applicable; and 10. The project is sited and designed so as to be harmonious with the surrounding area and not interfere with the development, use, and enjoyment of adjacent property; and Planning Board Resolution No. 2024-013 11. The project will promote building design that responds to the surrounding neighborhood; and 12. The project will ensure safe and efficient access for all site users, including pedestrians, cyclists, transit passengers, the mobility impaired, and motor vehicles, as applicable. NOW, THEREFORE, THE PLANNING BOARD RESOLVES THE FOLLOWING: The Planning Board hereby grant Site Plan Approval for the proposed site plan as described above, and as shown on the site plan noted above, subject to the following conditions: Conditions of Approval 1. Temporary erosion and sedimentation control measures for construction activity must be operational prior to commencement of any clearing or earthwork. 2. Any grading/fill on this site shall be done so as to not impact the surrounding properties. 3. All exposed ground must be reseeded within 30 days of the completion of construction. If reseeding is not practical due to weather or seasonal restraints, the ground must be covered with ulch. i I ning Bo. is Chair Date ✓ Ayes: Gragg, Klein, Liddle Nays: None Absent: Klankowski Abstain: None Information for Applicant 1. This approval shall expire within 18 months from the date of this decision unless a building permit has been obtained by the applicant, or if the applicant fails to comply with the conditions of this approval. Planning Board Resolution No. 2024-013 Page 2 of 2