HomeMy WebLinkAbout2026-05-19 PB Final MinutesPlanning Board Meeting Minutes Page 1 of 4
May 19, 2026
Planning Board
Zoom Hybrid Meeting
Meeting Minutes
May 19, 2026
Approved: June 16, 2026
Board Members Present: Chair Karl Klankowski, Linda Liddle, Jeff McDonald, Mo Klein
Quorum Present
Applicants Present: Ken Kearl, Carrie Pollock
Applicants Present on Zoom: None
Public Present on Zoom: Sheri Sprole, Bob Sprole, Sharon Sulimowicz, Leslie Webster, Cynthia Mannino,
Krys Cail
Town Staff Present: Niels Tygesen, Lori Asperschlager
Town Board Member Present: None
Proceedings
Chair Karl Klankowski called the meeting to order at 7:00 PM at Town Hall.
Approval of Agenda
Motion: Klein motioned to approve the agenda; Liddle seconded.
Vote: Chair Klankowski, aye; Liddle, aye; McDonald, aye; Klein, aye.
Motion Carried.
Board Member Reports
No board members in attendance
Approval of Past Minutes
Motion: Liddle motioned to approve May 5, 2026 minutes; McDonald seconded.
Vote: Chair Klankowski, aye; Liddle, aye; McDonald, aye; Klein, aye.
Motion Carried.
Privilege of the Floor
No members of the public were in attendance for privilege of the floor.
Motion: Klein motioned to close privilege of the floor; Liddle seconded.
Vote: Chair Klankowski, aye; Liddle, aye; McDonald, aye; Klein, aye.
Motion Carried.
Old Business Items
SPR2401-02: Kearl Site Plan Amendment, Final Site Plan & Public Hearing
The applicant and property owners, Kenneth and Patricia Kearl, applied for a site plan amendment for
the subject site to permit civil work within the HpE steep slope overlay including grading, excavation,
and fill of approximately 50cy, retaining walls, steps, rip-rap, gabions, and realignment of the driveway.
Applicant Kearl gave an update of the requests from the May 5 Planning Board of the site plan changes
to include the parking area and the width of the pathway. The parking area is marked out at the location
with survey pins.
Carrie Pollock, spoke on behalf of her clients Sheri & Bob Sprole and mentioned that the site plan does
Planning Board Meeting Minutes Page 2 of 4
May 19, 2026
not include the measurements for where the gravel parking area is. The Sproles and their engineering
firm, Delta, did not have enough information with the revised site plan.
Klein asked that Kearl add the measurements of the gravel parking area to the final plat before the plat
is signed. Kearl agreed to that condition.
Discussion ensued regarding the gravel parking area, surveyors, measurements, and survey pins.
Tygesen confirmed the following:
•This resolution will have conditions of approval.
•There is no local law that the Planning Board receives a survey for site plan approval, only that
the site plan needs to be to scale.
•The planning board can include a condition that the gravel parking area location measurements
be added to the site plan.
o Pollock would like the condition be added to include the measurements.
Pollock asked about the SEQR type action needed. Tygesen stated that in previous reviews of the site
plan in 2017 when the site was vacant and 2018 with a similar site plan amendment that a SEQR review
was not needed per State statute. Recent conflict counsel by Guy Kough confirmed that as well.
Motion: Klein motioned to open the public hearing; Liddle seconded.
Vote: Chair Klankowski, aye; Liddle, aye; McDonald, aye; Klein, aye.
Motion Carried.
Discussion ensued regarding safety concerns for turnaround area for emergency vehicles or propane
delivery trucks for the Sproles and a second surveyor company to have a survey. The planning board did
not find this relevant to the board’s decisions on the Kearl Site Plan as the placement of the gravel
parking area will not change the plans to his property and the concerns being brought up are civil issues.
Discussion moved on to other concerns received for the public hearing.
•Tygesen confirmed that the concrete pad is considered a structure by definition.
o The concrete pad was approved in the first site plan review in 2017/2018.
Not sure if the property owner obtained all required jurisdictional approvals at
that time.
•Neighbor Leslie Website asked about where the wall would be that Kearl is planning to install
o Concerned it is not 50’ back from the high water mark.
Tygesen stated that town code 212-162Fences and walls. exempts walls not
over 6’, so the 50’ setback is not applicable.
•If the majority of the board has concerns this site plan can be sent to
the BZA for final interpretation.
•Kearl has a Non-Jurisdictional Determination from the DEC and they recommended a retaining
wall (gabions) on the north line of the property to the concrete pad to help limit erosion.
o Discussion about adding vegetation (native plants) instead of the gabions.
o McDonald reminded the group that the discussion is not about installing a concrete wall
at the shoreline, and the gabions would not be a determent to the land.
The neighbors spoke again about the previous topics, however those comments were outside the
purview of the planning board.
Planning Board Meeting Minutes Page 3 of 4
May 19, 2026
Motion: Klein motioned to close the public hearing; McDonald seconded.
Vote: Chair Klankowski, aye; Liddle, aye; McDonald, aye; Klein, aye.
Motion Carried.
Brief discussion ensued regarding the gravel parking area.
Motion: Klankowski moved draft resolution for discussion; Klein seconded.
Vote: Chair Klankowski, aye; Liddle, aye; McDonald, aye; Klein, aye.
The board discussed adding the condition to include the measurements of the gravel parking area to the
resolution.
Motion: McDonald motioned to approved Planning Board Resolution No. 2026-011 A Resolution of Final
Site Plan Approval of the Kearl Site Plan Amendment Located at 1513 Taughannock Boulevard, Town of
Ulysses, Tax Parcel 18.-1-19.8; Klein seconded.
Vote: Chair Klankowski, aye; Liddle, aye; McDonald, aye; Klein, aye.
Motion Carried.
New Business Items
MNSUB2601-01: Koskinen 2 Lot Subdivision, Sketch Plat Review
The applicant and property owner, Roger Koskinen, applied for a minor subdivision for the subject site
to subdivide the approximately 26.50 acre lot into two lots, Parcel 1 approximately 1.20 acres and Parcel
2 approximately 25.29 acres.
Klein asked if Development District 6 is disappearing. Tygesen said that the parcel is split between DD6
and Agricultural/Rural zone, but the applicant is not asking for DD6 to be dissolved. There are 3 parcels
that are zoned DD6.
Klankowski spoke about DD6. It includes parcel number 22.-5-4 and an area of 500’ depth by 600’ width
on the other side of Podunk Road over parcels 21.-1-14 and 21.-1-13. He has been asking Tygesen how
these parcels got included and will the portion of the parcels stay included and it may require the Town
Board to redefine DD6 as part of this subdivision request.
Carrie Pollock spoke on behalf of the applicant and shared the reason behind the subdivision is because
Koskinen wants to sell parcel 1 with the garage which would stay within the current use of DD6.
Tygesen stated the DD6 code standards specify permitted uses, the boundaries of the zone, and certain
development standards such as signage. Based on the regulations there is no limitation to approve the
subdivision but can ask for legal review before the public hearing.
Tygesen brought up a concern of the language of the code and the allowed uses. Any new building in
DD6 would require town board approval. If a property owner in DD6 wanted to do a greenhouse or an
ADU, as allowed under Ag/Rural zone, it would require approval by the town board which seems
excessive. Recommends that the applicant review and discuss with their legal team on original intent
and when DD6 was created and for future plans of the various properties, and that they may want to
consider requesting a re-assessment of code language for DD6.
Planning Board Meeting Minutes Page 4 of 4
May 19, 2026
Continued discussion about Development Districts and how the Town integrated them and specifically
DD6 and suggestion of changing DD6 to the 1.20 acres that has the auto works business on it.
Pollock asked if there was no anticipated change in the use or anticipated development how is the issue
of DD6 relevant to the subdivision. Tygesen confirmed that the regulations do not prevent a subdivision
in DD6 but can ask for legal review before the public hearing.
Public hearing will be scheduled for June 16 meeting to allow time for town legal to review DD6.
Klankowski asked Pollock to see if the applicant has any history of property being assigned as DD6 and
any previous subdivisions.
Motion: Klankowski motioned to hold public hearing on June 16, 2026; Klein seconded.
Vote: Chair Klankowski, aye; Liddle, aye; McDonald, aye; Klein, aye.
Motion Carried.
Board Member Reports
None
Motion: Klein motioned to adjourn; McDonald seconded.
Vote: Chair Klankowski, aye; Liddle, aye; McDonald, aye; Klein, aye.
Motion Carried.
ADJOURNED at 8:48PM
Respectfully submitted by Lori Asperschlager, Planning Board Secretary
1
Niels Tygesen
From:Kenneth Kearl
Sent:Tuesday, May 5, 2026 11:30 AM
To:Niels Tygesen
Cc:Town of Ulysses Permits
Subject:Re: Town of Ulysses Public Hearing notice board and final site plan fees
Attachments:350sf area staked & cleared.jpg
Hi Niels,
During the 21-April-2026 Town Planning Board meeting, we reviewed our updated site plan and at that
time, I identified that we had received a NYS Supreme Court Order to remove limestone riprap from a
350sf parking area on our property. Your office considered the matter and I was informed that I could
remove the limestone riprap from the 350sf area without additional permit. During the NYS Supreme
Court trial, Mike Reagan, Reagan Land Surveying, was recognized by the Court as an expert
witness. Mike Reagan prepared Trial Exhibit VVV that the Judge referenced in the Court Order. On 1-May-
2026, Reagan Land Surveying completed a survey of our northern property line and staked the 350sq
parking area as specified in Judge Ahern's, NYS Supreme Court Order. On 4-May-2026, P&S Excavating
relocated all limestone riprap from the 350sf area as mandated by Judge Ahern's Court Order. We have
complied with and completed all requirements of the NYS Supreme Court Order. See attached photo.
of our updated site plan because of some ambiguity associated with the 350sf location and removal of
limestone riprap.. These concerns have been addressed and are not a valid reason for a delay in the
Town of Ulysses Planning Board approval process. I can only assume that Sprole is unhappy with Judge
Ahern's NYS Supreme Court ruling and Court Order regarding location of a 350sf parking area and the
fact that the Plaintiffs (Sprole) are permanently enjoined from any additional trespass on Defendants
(Kearl) property and now he is attempting to cause a delay in the Town of Ulysses Planning approval
process for our updated site plan.
See Judge Ahern's Court Order language regarding Sprole's rights (Plaintiffs) to utilize our property
(Defendants) for their benefit (below):
"It is ORDERED that Plaintiffs are permanently enjoined from any additional trespass
on Defendants’ property and shall not enter onto any portion of Defendants’ property
except for the permissible use of the access road and gravel parking area as defined
herein, unless explicitly invited in writing or granted permission in writing by
Defendants, including a prohibition against any trespass on Defendants’ land to access
the portion of the gravel parking area on Defendants’ property as Plaintiffs may only
access said portion of the gravel parking area via their own property;"
Best regards,
Ken Kearl
On Tue, May 5, 2026 at 9:55 AM Niels Tygesen <planner@townofulyssesny.gov> wrote:
2
Good Morning Ken,
Please note the draft resolution is available, it is subject to change, and comments from Bob Sprole and Leslie Webster
have been received, in addition to Bob’s and Leslie’s prior comments in 2024 and Michael Kimberly’s.
Niels Tygesen
Planner
Building, Code, Planning, & Zoning Department
607.387.5767 x222 | 10 Elm Street, Trumansburg, NY 14886
Re: Revised Kearl site Plan
Thank you for advising me you received my comments for the meeting of May 5 th 2026. I
appreciate your clarifying the code of 212-48 D-3
Given more time to get comments together I have found an article that I am attaching
below. It is put out by New York state and discusses the most effective means of shore
stabilization. Gabions are not best idea- native plants are the preferred option. This should
be considered in lieu of the artificial buffers Mr. Kearl wants to use.
Natural vegetation presents no environmental risk and preserves the natural beauty of the
area- one of the goals listed in the purpose section of the lakeshore zoning code.
I have a question about the northern area in Mr. Kearl’s proposed site map. It shows
placement of gabions and a limestone wall. Are these going to be on the bank above the
beach or on the beach at the high water mark ?
If on the beach they would be in violation of 212-47 which states at the bottom of the chart
that set back needs to be 50’ from the high water mark . I am assuming that gabions and
stone walls would be considered to be structures as they are solid and are attached to the
land. Structures have not been allowed on the beach in the past closer than 50’ from the
high water mark as they harden the beach presenting a problem with erosion and in this
case would also change the character of the neighborhood as no one else has any walls on
the beach. Please elaborate.
I might try to send additional photos illustrating good land stewardship of the lakeshore
illustrating how use of natural vegetation can protect against soil erosion and water run-off
and preserve the natural beaty of the shoreline without the need to use artificial buffers.
Thank you for your consideration.
Leslie Webster
1509 Taughannock Blvd
Shoreline Stabilization
Ecological Importance of Natural Shorelines
and Proper Shoreline Stabilization
This information was developed to increase awareness of the ecological importance of
natural shorelines, and to promote more enlightened approaches to shoreline stabilization.
By protecting the natural shoreline, you can help protect the key functions and values
provided by this essential ecological transition zone. Additional information on shoreline
protection may be found using the links in the right column.
Natural Shorelines
Natural shorelines are the undeveloped fringe areas along the edge of a waterbody, which
connect the shallow aquatic portion of the waterbody with adjacent upland. These riparian
areas provide important environmental functions, such as regulating water quality
(including temperature, clarity, nutrients, and contaminants) and sustaining critical habitat
for a variety of aquatic and terrestrial organisms (including invertebrates, fish, amphibians,
reptiles, shorebirds and waterfowl, and mammals).
Changes or disruptions to riparian areas can threaten the survival of species that rely on
this kind of habitat during their various life stages. They depend on these areas for
breeding, spawning, nesting, feeding, growing and escaping from predators. Protecting such
critical habitat is important - especially on lake shores that are experiencing development
pressure and on over-developed lake shores that have limited natural shorelines remaining.
Shoreline Erosion
Shoreline erosion is a natural process caused by wind, frost action and gravity, as well as
precipitation and wave and ice action. This natural wearing away of soil and rock can result
in benefits such as creation and replenishment of natural beaches. However, it can also
cause negative effects such as structural damage, degraded water quality and loss of
property and habitat.
Human activities, such as those listed below, often contribute to or accelerate the natural
shoreline erosion process, exacerbating the negative effects. However, with thought and
planning, such activities can be modified to avoid or reduce those effects.
Clearing Natural Vegetation
Often done by landowners to expand views or increase recreational areas, it destroys the
roots of plants that provide significant shoreline stabilization.
Construction or Development
When done uphill of a shoreline, it can result in increased stormwater runoff, resulting in
increased sediment loads to the water body.
Impervious Surfaces and Structures
Pavement, buildings, roofs, drainage ditches, etc. increase the amount, velocity and energy
of stormwater, resulting in more runoff being routed to streams and lakes (and less into the
ground), and increasing shoreline erosion.
Agricultural Practices
These can modify the rate of erosion and increase levels of nutrients in streams and lakes.
The effects are greatest in the spring when snow is melting, the soil is saturated and water
runoff is highest.
Shoreline Projects
Erecting walls, and other such projects, reduces habitat and commonly affects property
elsewhere due to redirection of waves away from the area in which the wall was installed.
Such projects also can change the natural “drift” of loose material.
Shoreline Stabilization
For decades, “traditional” shoreline stabilization methods have centered on “hard”
construction approaches such as vertical concrete, metal, or wood break-walls, gabions
(stone-filled wire baskets) and rip rap (loose rocks or stones). Biologists and engineers now
realize that in addition to creating a physical barrier, these hardened vertical or near-
vertical structures reflect wave energy rather than absorb it, thereby worsening turbulence
and increasing erosion in front of, under and adjacent to the “fix”.
The effects of turbulence and erosion are not as severe when rip rap is used because it
absorbs some of the energy from moving water. However, depending on its size and
placement, rip rap still can create a barrier to many wildlife species, and, as with solid
structures, reduces vegetated habitat.
The adverse effects of traditional shoreline stabilization methods can be significant, as hard
erosion-control solutions do not provide the water quality or habitat benefits of a natural or
restored vegetated shoreline.
Adverse changes to natural resources include
the following:
• Reduced or degraded habitat for breeding,
spawning, nesting, feeding, growing,
escaping from predators, and
thermoregulation and/or “loafing” for a
variety of fish and wildlife species;
• Impaired movement of organisms between
aquatic and terrestrial habitat;
• Altered physical structure of the water’s edge, with resultant changes to hydrology;
• Increased infestation of invasive plants (e.g., Eurasian watermilfoil) due to wave action
against the hard structure, causing increased fragmentation and dispersal of plants and
“re-seeding” of the water body;
• Local changes in water quality, including changes to temperature and increases in
turbidity, nutrients and contaminants;
• Increased erosion of the adjacent natural shorelines and scouring in front of the
structure.
Preferred Methods
Soft or natural approaches to shoreline stabilization are recognized now as being
more environmentally effective. When shoreline repair or stabilization becomes
necessary, these methods should be considered first.
Natural approaches seek to restore hydrological and ecological balance by using methods
that are structurally sound as well as economically feasible and ecologically sustainable.
While there are many ways to protect an existing shoreline or restore an eroded one,
choosing appropriate materials and design is important. Soft methods may include planting
native, deep-rooting vegetation, as well as bioengineering. In all cases, the proposed
stabilization method should follow the natural contour of the shoreline.
Preserving the Natural Shoreline
Shoreline stabilization can be as simple as not
mowing the grass or not cutting the trees and
shrubs along the shoreline. This allows natural
vegetation to grow or become re-established. A
naturally vegetated shoreline has many benefits.
It prevents contaminants or excess nutrients
from entering the water; it prevents erosion
caused by rain, wind, wave and ice action, and it
provides food, shade and cover for fish and
wildlife. If some vegetation must be removed,
limit the amount. Try to prune trees and shrubs
back instead of removing them altogether.
Planting Along the Shoreline
Planting native, deep-rooting species (check with your local soil and water conservation
service for suggestions) will help accelerate shoreline stabilization. Many low-growing
species are available that will not block waterfront views. Some species of common shrubs
have roots that extend deep into the soil, helping to keep the soil and shoreline together.
When damage does occur to a natural shoreline, native plants can easily re-establish.
Bioengineering (Soft Structures)
Where planting is not sufficient to stop erosion,
a bioengineering approach may be more
appropriate. Bioengineering incorporates plants
in combination with natural materials such as
logs, live stakes (e.g., cuttings from species like
willow), and brush bundles (i.e., branches from
live woody plants), creating a natural
appearance and habitat for fish and wildlife.
Bioengineering designs can lead to long-term
stabilization of a shoreline, reducing the need
for future work.
Less Preferred Methods
Hard approaches should be considered only where erosive forces are severe, and
softer approaches would not be effective structurally.
When a site requires the use of “harder” structures, steps should be taken to reduce
potential adverse effects by limiting the project area to the smallest possible footprint
necessary; by protecting the toe or base of vertical structures with rip rap or stone; and, if
appropriate, by incorporating passage areas to facilitate movement of wildlife to and from
the water. The “fix” should follow the natural contour of the shoreline to the greatest extent
possible.
Rip Rap
Rip rap stabilization designs should include appropriate bank slope and rock size to protect
from wave and current action and to prolong the life of the embankment. A final slope ratio
of at least 1:2 (vertical to horizontal) is recommended, and a more stable 1:3 slope should
be used where possible.
A layer of gravel, small stone, or filter cloth placed under and/or behind the rock helps
prevent failure. It also prevents the release of sediment – which can be harmful to fish,
their eggs, and their food supply - into the water body.
In many cases, only the toe of the slope may need rock reinforcement; the remainder can
be planted with native vegetation. The rock must be clean, free of silts and organic debris
and must not come from the water body, as this will affect aquatic habitat.
Vegetation, especially deep rooting species, planted above and immediately behind the rock
will greatly increase the stability of the slope and provide additional habitat, food supply and
hiding spaces for a greater variety of species.
Gabion Baskets
Gabion baskets provide marginal habitat, and, when exposed to the elements, their
durability is questionable. Consequently, their use is not encouraged.
Retaining Walls
Retaining walls are not encouraged and generally
are not approved.
These structures (typically sheet steel, concrete,
wood or large armor stone) produce a sterile,
vertical, flat-faced object which is of little use to
aquatic organisms and other wildlife. They also
tend to reflect wave energy rather than dissipate
it, usually resulting in erosion problems in front
of the “fix” and elsewhere.
However, when erosive forces are severe,
existing building foundations or structures are
threatened, and softer stabilization approaches
would not be effective, a new or replacement
retaining wall may be warranted. In these cases,
rock should be placed at the toe to reduce the
adverse impacts of reflected wave energy.
Whenever possible, replacement structures should be installed above the mean high water
elevation or behind or on the same footprint as the existing structure; not by encroaching
into the water. The existing structure, and all fill in the intervening areas, should be
removed and the exposed bed restored.
Other Tips for a Healthy Shoreline and Water Body
Avoid using fertilizers, herbicides and pesticides on your property. Rain will transport these
harmful chemicals into the water, impairing water quality and adversely affecting aquatic
organisms. In addition, fertilizers increase the nutrient input, which increases algae and
aquatic plant growth. When the plants die, the decay process uses up dissolved oxygen in
the water, reducing the amount available to fish.
Use soaps and detergents that are phosphorus/phosphate free. Excessive phosphorus levels
cause increased growth of aquatic plants and algae. “1 lb. of phosphorus = 300 to 500 lbs.
of algae”
Make sure your septic system is maintained and the tank is pumped out on a regular basis.
Maintain shrubs or trees in the area between the septic system and the water. Plants help
capture some of the nutrients that pass through the septic system.
SUMMARY: Shoreline work should be proposed only when a problem exists and needs fixing
(i.e., to stabilize identified erosion areas) - not to decorate, landscape, or reclaim land.
When work is necessary, natural approaches should be considered first.
DEC Permits Required
Protection of Waters (ECL Article 15,Title 5)
Applies to disturbance to bed or banks of streams classified as C(T) or higher, and
excavation or placement of fill below the mean high water level of navigable waters of the
state (including wetlands that are adjacent to and contiguous at any point to any navigable
water of the state).
Freshwater Wetlands (ECL Article 24)
Applies to NYSDEC regulated Freshwater Wetlands (i.e., outside the Adirondack Park)
Basis for Permit Issuance:
1. The proposal must be reasonable and NECESSARY (i.e., it will resolve a problem).
2. It must not endanger the health, safety or welfare of the people of the State of New
York.
3. It must not cause unreasonable, uncontrolled or unnecessary damage to the natural
resources of the state, including soil, forests, water, fish, shellfish, crustaceans and the
aquatic and land-related environment.
Other Potential Permits
Permits may also be required from other government agencies, such as but not limited to:
Adirondack Park Agency (518-891-4050) – If your proposal involves shoreline work in
the Adirondack Park, please contact the Adirondack Park Agency before finalizing plans. This
will help to eliminate unnecessary delays and assure that your project design satisfies both
agencies.
U.S. Army Corps of Engineers (NY District: 518-266-6350; Buffalo District: 716-879-
4330) – The Corps of Engineers regulates activities involving dredging, excavation,
placement of fill, or construction of certain structures in waterways and wetlands of the
United States.
Further Information and Jurisdictional Inquiries
Please contact the appropriate DEC regional Environmental Permits office, based on the
county where the project is located.
To: Planning Board- Town of Ulysses
May 18th 2026
Re: Kearl revised site plan- photos and additional documentation of properties in the
area of the Kearl property
From: Leslie Webster
Address: 1509 Taughannock Blvd
Examples of good lake stewardship
I am attaching these photos of the properties surrounding and in the vicinity of the Kearl
property to illustrate how they demonstrate good stewardship of the lakeshore. All the
banks are held by native trees and plants and the beaches are unencumbered by
structures and artificial buffers such as concrete pads, riprap, gabions or stone walls.
None of this is needed on the properties shown below to keep erosion and run off at
bay. Mr. Kearl’ s present shoreline and the proposed changes he wants to make on his
property will not be in harmony with the neighborhood.
The pictures below show the shoreline between the two properties to the south of Mr.
Kearl’s property. You can observe how the natural vegetation holds the shoreline,
preserves the natural beauty and attracts wildlife. These swans appeared out of
nowhere this past summer. Aren’t they beautiful! Ducks often eat some of the plants that
hang down from the bank.
These pictures of two houses south of the Kearl property were taken at the top of the
bank and show that the area is mostly permeable land which absorbs rain and most of
the water runs off down the bank. Plants and trees along the bank hold the soil and
prevent soil erosion and water runoff. A natural way of demonstrating good land
stewardship. Our new septic is in the grassy area. The area was covered with mud after
the new septic was put in so they had to plant grass to prevent erosion. We hope the
native plants will take over soon. Two hemlock trees on the bank were lost to the woolly
adelgid. We plan to plant white pine in their place- never a gabion, riprap or stone wall!
The last 2 pictures show the shoreline of the two properties to the south of Kearl and his
current shoreline (behind the blue tarp) . I am not sure why this fence was needed as it
does nothing to enhance the beauty of the shoreline. The bank behind Mr. Kearl’s
shoreline is barren as he removed all his trees and natural plants when he bought the
property. We all wondered why he would do such a thing! I don’t recall there was ever
an issue with erosion before he bought the property.
Viewing the last two pictures- which one do you think illustrates the purpose section of
the lakeshore zoning code- to keep the lakeshore as natural as possible “to protect the
fragile environment of the lakeshore“ and “to provide a regulatory framework in which
development can occur with minimal impact to the environment”? If you look carefully at
the first picture, you can see a heron standing on a stone in the lake.
There is also an eagle nest in a tree on the property just south of Kearl. The eagles
return each year and we watch them fly out around 5 pm to catch fish in the lake, which
is a very cool site to see.
Good stewardship will keep the lakeshore beautiful, viable and natural as these
photos illustrate. Leaving or enhancing natural vegetation is far superior for holding
the soil and preventing water runoff than putting up gabions, riprap and stone walls
which look artificial, harden the shoreline, will wear out in time and are not
harmonious with the neighborhood around them. They will also encroach on habitat
for the wildlife that reside and live off the native plants in the area.
It is extremely sad that so many new residents do not know how to be good
stewards of the lakeshore. They do not put a priority on keeping it environmentally
viable or on preserving the natural beauty of the area. It is the obligation of the
Planning Board to provide guidance and to make decisions taking into account the
important features of the zoning code i.e. adhering to specific provisions of the
Lakeshore section of the zoning code ( 212- 48) (B) Vegetation and Landscape- 1
and 2, and section 4 – Recommendations ( b,c,h,n) and also to the spirit of
preserving the lakeshore as stated in the Purpose section. Otherwise the Lakeshore
will lose all of its value and beauty. Protecting the environment and being in harmony
with surrounding properties is critical.
Planning Board
May 19th 2026
Re: Kearl revised site plan
Flooding concerns with solid structures on the shoreline of Cayuga Lake
I would appreciate a definition of a structure. According to NY state concrete pads and
walls are considered to be structures as they are permanently attached to the soil. There
are regulations for setbacks for structures. In the Ulysses zoning code it is 50 ‘back from
the high-water mark. (bottom of chart 212-47). The placement of the concrete pad violates
this part of the code as it is at the high water mark and not 50’ back.
In addition, structures near the water present a flooding hazard as they harden the beach
and during a flood the water will be diverted to neighboring properties and possibly damage
beach wells by clogging them with silt and debris. There is past and current history of
flooding on Cayuga Lake. There was massive flooding in 1972 and in 2018 where the water
came up well above the high water mark, destroyed docks and even reached steps of
houses on the beach. The past two years Cayuga Lake has been at or above flood stage
along several areas of the shoreline. It is not impossible to predict that flooding will likely
occur in the future . It is the lowest of all the Finger Lakes and the water will have nowhere
else to go.
In this light allowing construction of solid permanent structures less than 50’ from the high
water mark poses a danger should not be allowed per the zoning code.
Can you please supply me with the documentation the shows when and how Mr. Kearl was
permitted to install his concrete pad on his beach. Now that he is proposing to install a
solid structure stone wall at the high water mark this is an additional concern for the safety
of all the properties in the vicinity in the event of flooding.
Leslie Webster
1509 Taughannock Blvd