HomeMy WebLinkAbout2026-07-15_FINAL FEAF Narrative Ulysses Comprehensive Plan 2045TOWN OF ULYSSES TOWN BOARD
STATE ENVIRONMENTAL QUALITY REVIEW (SEQR) FULL ENVIRONMENTAL ASSESSMENT FORM (EAF) PART 3
EVALUATION OF THE MAGNITUDE AND IMPORTANCE OF THE PROJECT IMPACTS AND DETERMINATION OF
SIGNIFICANCE
Town of Ulysses Comprehensive Plan
Comprehensive Plan Impact on Community Review
June 30, 2026
1
The Ulysses Town Board has reviewed and accepted Part 1 of the Full Environmental Assessment
Form (EAF) for this action. The Town Board completed a coordinated review under the State
Environmental Quality Review (SEQR) Regulations and received no objections to its designation
as Lead Agency. The Town Board designated itself as the lead agency and, under the provisions
of Part 617 of the SEQR Regulations, has given a thorough and comprehensive evaluation of the
impacts likely to result from the proposed Action.
The proposed action being considered, the adoption of the Comprehensive Plan as a policy
document, does not include physical development. Development patterns described in the future
land use plan and throughout the document do not occur suddenly and may not occur at all.
Future actions will occur independently of this plan and each other, are under varied ownership,
occur in uncommon locations, and are not induced by the current action. Additionally, future
actions do not share common impacts.
As a result, an analysis of the Comprehensive Plan’s physical impacts on development patterns is
considered speculative. The State Environmental Quality Review Process will occur as future
actions are applied for or as approvals are sought. Analyzing and reviewing physical projects
results in a more accurate environmental review process. These reviews will be no less protective
of the environment.
The following analysis identifies the expected impacts the plan will have on the community, based
on the criteria in the FEAF Part 2 and the supporting reasoning.
TOWN OF ULYSSES TOWN BOARD
STATE ENVIRONMENTAL QUALITY REVIEW (SEQR) FULL ENVIRONMENTAL ASSESSMENT FORM (EAF) PART 3
EVALUATION OF THE MAGNITUDE AND IMPORTANCE OF THE PROJECT IMPACTS AND DETERMINATION OF
SIGNIFICANCE
Town of Ulysses Comprehensive Plan
Comprehensive Plan Impact on Community Review
June 30, 2026
2
1. Impact on Land
Because this action involves no physical changes and includes only the adoption of a policy
document, there will be no impact on land.
Future development will be required to meet all Town and NYS development standards.
The Comprehensive Plan includes policy guidance that development should not
jeopardize environmentally sensitive landscapes (e.g., Steep Slopes).
The Town coordinated a review of this draft with interested agencies, including Tompkins
County, the New York State Department of Environmental Conservation, and others, and
received no comments regarding impacts on land.
Therefore, the Town Board has checked “no.”
2. Impact on Geological Features
The New York State Department of Environmental Conservation identifies a number of
Unique Geologic Features in the Town of Ulysses, including Taughannock Falls State Park
and Taughannock Falls Park Road. Additionally, Tompkins County has identified a number
of Unique Natural Areas such as Hart Woods, Waterburg Wetland, Smith Woods, Iradell
Wetland, Taughannock Gorge, Willow Creek Glen and Lake Slopes, Maplewood Glen and
Lake Slopes, and Glenwood Ravine and Lake Slopes.
The draft Comprehensive Plan includes a detailed discussion of these areas. It also
includes goals to proactively preserve and protect these areas, and to promote public
access to them as protected ecotourism resources.
The Town coordinated a review of this draft with interested agencies, such as Tompkins
County, the New York State Department of Environmental Conservation, and numerous
others, and received no comments regarding impacts on geological features.
Therefore, the Town Board has checked “no.”
TOWN OF ULYSSES TOWN BOARD
STATE ENVIRONMENTAL QUALITY REVIEW (SEQR) FULL ENVIRONMENTAL ASSESSMENT FORM (EAF) PART 3
EVALUATION OF THE MAGNITUDE AND IMPORTANCE OF THE PROJECT IMPACTS AND DETERMINATION OF
SIGNIFICANCE
Town of Ulysses Comprehensive Plan
Comprehensive Plan Impact on Community Review
June 30, 2026
3
3. Impacts on Surface Water
Because this action involves no physical changes and includes only the adoption of a policy
document, there will be no impact on surface water.
Future development will be required to meet all Town and NYS development standards,
including preparing a stormwater pollution protection plan (SWPPP) or securing wetland
permits, if applicable. The Comprehensive Plan includes a goal to proactively preserve and
protect the natural and environmental resources in Ulysses (e.g., wetlands, woodlands,
lakeshore, etc.).
The Town coordinated a review of this draft with interested agencies, including Tompkins
County, the New York State Department of Environmental Conservation, and others, and
received no comments regarding impacts on surface water.
Therefore, the Town Board has checked “no.”
4. Impact on Groundwater
Because this action involves no physical changes and includes only the adoption of a policy
document, there will be no impact on groundwater.
The Future Land Use Plan envisions some residential uses in areas currently without water
and sewer services, therefore necessitating the use of private wells and on-site
wastewater treatment systems. This is similar to existing development patterns in the
current adopted comprehensive plan and does not represent a policy change. However,
the draft 2045 Comprehensive Plan also envisions extending water and sewer services in
some areas to reduce demand for on-site water/sewer services. The plan further intends
to focus residential development in areas with existing or planned services, thereby
minimizing groundwater usage.
TOWN OF ULYSSES TOWN BOARD
STATE ENVIRONMENTAL QUALITY REVIEW (SEQR) FULL ENVIRONMENTAL ASSESSMENT FORM (EAF) PART 3
EVALUATION OF THE MAGNITUDE AND IMPORTANCE OF THE PROJECT IMPACTS AND DETERMINATION OF
SIGNIFICANCE
Town of Ulysses Comprehensive Plan
Comprehensive Plan Impact on Community Review
June 30, 2026
4
Future development will be required to meet all Town and NYS development standards,
including subdivision and/or site plan approval from the Town Planning Board, which will
consider the availability and impact of services.
The Town coordinated a review of this draft with interested agencies, such as the Town
Planning Board, Tompkins County, the New York State Department of Environmental
Conservation, and numerous others. The Town received no comments about impacts on
groundwater.
Therefore, the Town Board has checked “no.”
5. Impact on Flooding
Because this action involves no physical changes and includes only the adoption of a policy
document, there will be no impact on flooding.
Future development will be required to meet all Town and NYS development standards,
including securing floodplain development permits, where applicable. The
Comprehensive Plan includes an objective and associated policies to reduce the impacts
of flooding throughout Ulysses. The plan also includes a separate policy to identify lands
subject to flooding and restrict housing development within those areas.
The Town coordinated a review of this draft with interested agencies, including Tompkins
County, the New York State Department of Environmental Conservation, and numerous
others, and received no comments about impacts on flooding.
Therefore, the Town Board has checked “no.”
6. Impacts on Air and Climate
Because this action involves no state-regulated air emissions, there will be no impact on
air. Further, the plan includes a climate change chapter that addresses policies to prepare
for climate change and reduce greenhouse gas emissions.
TOWN OF ULYSSES TOWN BOARD
STATE ENVIRONMENTAL QUALITY REVIEW (SEQR) FULL ENVIRONMENTAL ASSESSMENT FORM (EAF) PART 3
EVALUATION OF THE MAGNITUDE AND IMPORTANCE OF THE PROJECT IMPACTS AND DETERMINATION OF
SIGNIFICANCE
Town of Ulysses Comprehensive Plan
Comprehensive Plan Impact on Community Review
June 30, 2026
5
Therefore, the Town Board has checked “no.”
7. Impact on Plants and Animals
Because this action involves no physical changes and includes only the adoption of a policy
document, there will be no impact on plants and animals.
Future development will be required to meet all Town, NYS, and Federal development
standards, including permits for impacts to endangered, threatened, or protected species
and their habitats. Development will also utilize the IPac tool to evaluate future impacts.
The Comprehensive Plan noted that there are threatened and endangered flora and fauna
in the Town. As a result, it includes the following policy: Work with the U.S. Fish and
Wildlife Service to learn about threatened and endangered species and to share resources
and measures that can be taken to protect these species during future development.
The Town coordinated a review of this draft with interested agencies, including Tompkins
County, the New York State Department of Environmental Conservation, and others, and
received no comments regarding impacts on plants and animals.
Therefore, the Town Board has checked “no.”
8. Impact on Agricultural Resources
The proposed action, the adoption of a municipal plan, may impact agricultural resources
through policies related to agricultural operations and land management.
Therefore, the Town Board has checked “yes.”
a. The proposed action may impact soil classified within soil group 1 through 4 of the NYS
Land Classification System.
Because this action involves no physical changes and includes only the adoption of a policy
document, there will be no direct impact on agricultural soils.
TOWN OF ULYSSES TOWN BOARD
STATE ENVIRONMENTAL QUALITY REVIEW (SEQR) FULL ENVIRONMENTAL ASSESSMENT FORM (EAF) PART 3
EVALUATION OF THE MAGNITUDE AND IMPORTANCE OF THE PROJECT IMPACTS AND DETERMINATION OF
SIGNIFICANCE
Town of Ulysses Comprehensive Plan
Comprehensive Plan Impact on Community Review
June 30, 2026
6
Most of the Town of Ulysses consists of Prime Farmland in soil groups 1 through 4. In the
Future Land Use Plan, the majority of the Town is within the Agricultural & Natural
Resources Lands, Resource Conservation, Low-Density Residential, or Rural Residential
future land use categories. These categories are intended to protect and conserve
agricultural uses or minimize impacts.
The Comprehensive Plan states that “The Town is committed to preserving and enhancing
the agricultural land base, promoting economic activities, and marketing support for a
strong agricultural industry.” Further, the plan includes an objective to keep farmland
active and productive. Where future development is proposed, the zoning and subdivision
codes include protections to minimize impacts on agricultural lands. The Planning Board
will review for these impacts where applicable. The plan also includes a policy to allow
conservation subdivisions as a way to preserve farmland.
The Town Board coordinated a review of this draft with interested agencies, including
Tompkins County, the New York State Department of Agriculture and Markets, and
numerous others, and received no comments regarding impacts on agricultural soils.
Therefore, the Town Board determines there will be “no to small impact.”
b. The proposed action may sever, cross, or otherwise limit access to agricultural land
(includes cropland, hayfields, pasture, vineyard, orchard, etc.).
Because this action involves no physical changes and includes only the adoption of a policy
document, there will be no direct impact on agricultural access.
The Comprehensive Plan states that “The Town is committed to preserving and enhancing
the agricultural land base, promoting economic activities, and marketing support for a
strong agricultural industry.” Further, the plan includes an objective to keep farmland
active and productive. Where future development is proposed on these lands, the zoning
and subdivision codes include protections to minimize impacts. The Planning Board will
review for these impacts, where applicable.
TOWN OF ULYSSES TOWN BOARD
STATE ENVIRONMENTAL QUALITY REVIEW (SEQR) FULL ENVIRONMENTAL ASSESSMENT FORM (EAF) PART 3
EVALUATION OF THE MAGNITUDE AND IMPORTANCE OF THE PROJECT IMPACTS AND DETERMINATION OF
SIGNIFICANCE
Town of Ulysses Comprehensive Plan
Comprehensive Plan Impact on Community Review
June 30, 2026
7
The Town Board coordinated a review of this draft with interested agencies, including
Tompkins County, the New York State Department of Agriculture and Markets, and
numerous others, and received no comments regarding impacts on agricultural soils.
Therefore, the Town Board determines there will be “no to small impact.”
c. The proposed action may result in the excavation or compaction of the soil profile of
active agricultural land.
Because this action involves no physical changes and includes only the adoption of a
policy document, there will be no direct impact on excavation or compaction of
agricultural soils.
The Comprehensive Plan states that “The Town is committed to preserving and
enhancing the agricultural land base, promoting economic activities, and marketing
support for a strong agricultural industry.” Further, the plan includes an objective to keep
farmland active and productive. Where future development is proposed on these lands,
the zoning and subdivision codes include protections to minimize impacts. The Planning
Board will review for these impacts, where applicable.
The Town Board coordinated a review of this draft with interested agencies, including
Tompkins County, the New York State Department of Agriculture and Markets, and
numerous others, and received no comments regarding impacts on agricultural soils.
Therefore, the Town Board determines there will be “no to small impact.”
d. The proposed action may irreversibly convert agricultural land to non-agricultural
uses, either more than 2.5 acres if located in an Agricultural District, or more than 10
acres if not within an Agricultural District.
Because this action involves no physical changes and includes only the adoption of a
policy document, there will be no direct conversion of agricultural lands.
TOWN OF ULYSSES TOWN BOARD
STATE ENVIRONMENTAL QUALITY REVIEW (SEQR) FULL ENVIRONMENTAL ASSESSMENT FORM (EAF) PART 3
EVALUATION OF THE MAGNITUDE AND IMPORTANCE OF THE PROJECT IMPACTS AND DETERMINATION OF
SIGNIFICANCE
Town of Ulysses Comprehensive Plan
Comprehensive Plan Impact on Community Review
June 30, 2026
8
In the Future Land Use Plan, the majority of the Town is within the Agricultural & Natural
Resources Lands, Resource Conservation, Low-Density Residential, or Rural Residential
future land use categories. These categories are intended to protect and conserve
agricultural uses or minimize impacts. The Comprehensive Plan states that “The Town is
committed to preserving and enhancing the agricultural land base, promoting economic
activities, and marketing support for a strong agricultural industry.” It further states,
“The Town should apply strict regulatory measures for the conversion of these
[Agricultural and Natural Resource Designated] lands away from agriculture and natural
resource uses...” Additionally, the plan includes an objective to keep farmland active and
productive.
Where future development is proposed on these lands, the zoning and subdivision codes
include protections to minimize impacts. The Planning Board will review for these
impacts, where applicable. The plan also includes a policy to allow conservation
subdivisions to preserve farmland. Further, the plan directs future development to
currently developed nodes and corridors within the Town, such as the Hamlet of
Jacksonville and the Route 96 Corridor, to minimize the conversion of agricultural lands.
The Town Board coordinated a review of this draft with interested agencies including
Tompkins County, the New York State Department of Agriculture and Markets, and
numerous others, and received no comments about impacts on agricultural land
conversion.
Therefore, the Town Board determines there will be “no to small impact.”
e. The proposed action may disrupt or prevent installation of an agricultural land
management system
Because this action involves no physical changes and includes only the adoption of a
policy document, there will be no direct impact on agricultural land management
systems.
The Comprehensive Plan states that “The Town is committed to preserving and
enhancing the agricultural land base, promoting economic activities, and marketing
TOWN OF ULYSSES TOWN BOARD
STATE ENVIRONMENTAL QUALITY REVIEW (SEQR) FULL ENVIRONMENTAL ASSESSMENT FORM (EAF) PART 3
EVALUATION OF THE MAGNITUDE AND IMPORTANCE OF THE PROJECT IMPACTS AND DETERMINATION OF
SIGNIFICANCE
Town of Ulysses Comprehensive Plan
Comprehensive Plan Impact on Community Review
June 30, 2026
9
support for a strong agricultural industry.” Further, the plan includes an objective to keep
farmland active and productive. Where future development is proposed on these lands,
the zoning and subdivision codes include protections to minimize impacts. The Planning
Board will review for these impacts, where applicable.
The Town Board coordinated a review of this draft with interested agencies, including
Tompkins County, the New York State Department of Agriculture and Markets, and
numerous others, and received no comments regarding impacts on agricultural land
management systems.
Therefore, the Town Board determines there will be “no to small impact.”
f. The proposed action may result, directly or indirectly, in increased development
potential or pressure on farmland.
Because this action involves no changes to development regulations and includes only the
adoption of a policy document, there will be no direct increase in development potential
on farmland as a result of this action.
In the Future Land Use Plan, the majority of the Town is within the Agricultural & Natural
Resources Lands, Resource Conservation, Low-Density Residential, or Rural Residential
future land use categories. These categories are intended to protect and conserve
agricultural uses or minimize impacts. Many low-density and rural residential parcels
already exist on the ground and are reflected on the Future Land Use Map. Future
development, like medium-density residential, is concentrated along State Route 96, on
Cold Springs Road, and around the Village. This development pattern follows existing
water infrastructure. Organizing development along this corridor prevents housing from
sprawling/developing onto productive agricultural lands. Additionally, concentrating
development potential in these areas will relieve development pressure on farmland.
The Comprehensive Plan states that “The Town is committed to preserving and
enhancing the agricultural land base, promoting economic activities, and marketing
support for a strong agricultural industry.” It further states, “The Town should apply
strict regulatory measures for the conversion of these [Agricultural and Natural Resource
TOWN OF ULYSSES TOWN BOARD
STATE ENVIRONMENTAL QUALITY REVIEW (SEQR) FULL ENVIRONMENTAL ASSESSMENT FORM (EAF) PART 3
EVALUATION OF THE MAGNITUDE AND IMPORTANCE OF THE PROJECT IMPACTS AND DETERMINATION OF
SIGNIFICANCE
Town of Ulysses Comprehensive Plan
Comprehensive Plan Impact on Community Review
June 30, 2026
10
Designated] lands away from agriculture and natural resource uses.” Additionally, the
plan includes an objective to keep farmland active and productive. Where future
development is proposed, the zoning and subdivision codes include protections to
minimize impacts to these lands. The Planning Board will review for these impacts,
where applicable. The plan also includes a policy to allow conservation subdivisions as a
way to preserve farmland. Further, the plan directs future development to currently
developed nodes and corridors within the Town, such as the Hamlet of Jacksonville, and
the Route 96 Corridor, to minimize the conversion of agricultural lands
The Town Board coordinated a review of this draft with interested agencies, including
Tompkins County, the New York State Department of Agriculture and Markets, and
numerous others, and received no comments regarding impacts on agricultural land
conversion.
Therefore, the Town Board determines there will be “no to small impact.”
g. The proposed project is not consistent with the adopted municipal Farmland Protection
Plan.
The Town of Ulysses Agriculture and Farmland Protection Plan recognizes that
development is occurring within the Route 96 Corridor South, Lakefront, Village Edge,
Agricultural core, and Hamlet areas. The Town of Ulysses Agriculture Farmland Protection
Plan suggests development to occur around the Village Edge and Hamlet. The Lakefront
continues to develop while remaining limited between Dubois Road and Route 89. Many
parcels within the Route 96 corridor are already developed and may not be in the
Agricultural District.
The Comprehensive Plan provides goals and objectives supporting the preservation of
farmland through land use policies and education. Both plans support and discuss the
right-to-farm law and cluster or conservation subdivision policies.
Therefore, the Town Board determines there will be “no to small impact.”
TOWN OF ULYSSES TOWN BOARD
STATE ENVIRONMENTAL QUALITY REVIEW (SEQR) FULL ENVIRONMENTAL ASSESSMENT FORM (EAF) PART 3
EVALUATION OF THE MAGNITUDE AND IMPORTANCE OF THE PROJECT IMPACTS AND DETERMINATION OF
SIGNIFICANCE
Town of Ulysses Comprehensive Plan
Comprehensive Plan Impact on Community Review
June 30, 2026
11
9. Impact on Aesthetic Resources
Because this action involves no physical changes and includes only the adoption of a policy
document, there will be no direct impact on aesthetic resources. The Future Land Use
Plan designates areas around scenic or aesthetic resources as Parks and Open Space, to
preserve them.
The Town coordinated a review of this draft with interested agencies, including Tompkins
County, the New York State Department of Environmental Conservation, NYS Office of
Parks, Recreation, and Historic Preservation, the Erie Canalway National Heritage Corridor,
and nearby municipalities, and received no comments regarding impacts on aesthetic
resources.
Therefore, the Town Board has checked “no.”
10. Impact on Historic and Archaeological Resources
Because this action involves no physical changes and includes only the adoption of a policy
document, there will be no direct impact on Historic and Archaeological Resources.
The plan includes a section, Built Environment, with numerous goals and policies relating
to the preservation of historic resources.
The Town coordinated a review of this draft with interested agencies, including Tompkins
County, the New York State Department of Environmental Conservation, NYS Office of
Parks, Recreation, and Historic Preservation, the Erie Canalway National Heritage Corridor,
and nearby municipalities, and received no comments regarding impacts on aesthetic
resources.
Therefore, the Town Board has checked “no.”
TOWN OF ULYSSES TOWN BOARD
STATE ENVIRONMENTAL QUALITY REVIEW (SEQR) FULL ENVIRONMENTAL ASSESSMENT FORM (EAF) PART 3
EVALUATION OF THE MAGNITUDE AND IMPORTANCE OF THE PROJECT IMPACTS AND DETERMINATION OF
SIGNIFICANCE
Town of Ulysses Comprehensive Plan
Comprehensive Plan Impact on Community Review
June 30, 2026
12
11. Impact on Open Space and Recreation
Because this action involves no physical changes and includes only the adoption of a policy
document, there will be no direct loss of Open Space and Recreation resources.
The plan includes an element, Community Well-Being, with numerous goals, objectives,
and policies relating to increasing and enhancing recreation and open space resources.
The Town coordinated a review of this draft with interested agencies, including Tompkins
County, the New York State Department of Environmental Conservation, NYS Office of
Parks, Recreation, and Historic Preservation, the Erie Canalway National Heritage Corridor,
and nearby municipalities, and received no comments regarding impacts on aesthetic
resources.
Therefore, the Town Board has checked “no.”
12. Impact on Critical Environmental Areas
Based on the NYS Department of Environmental Conservation’s DECinfo Locator, there are
no Critical Environmental Areas in the Town of Ulysses. The draft Comprehensive Plan
includes recommendations to consider local adoption of Critical Environmental Areas to
protect them from future development.
Therefore, the Town Board has checked “no.”
13. Impact on Transportation.
The proposed action, the adoption of a municipal plan, may impact transportation
systems through policies related to land use and transportation networks.
Therefore, the Town Board has checked “yes.”
TOWN OF ULYSSES TOWN BOARD
STATE ENVIRONMENTAL QUALITY REVIEW (SEQR) FULL ENVIRONMENTAL ASSESSMENT FORM (EAF) PART 3
EVALUATION OF THE MAGNITUDE AND IMPORTANCE OF THE PROJECT IMPACTS AND DETERMINATION OF
SIGNIFICANCE
Town of Ulysses Comprehensive Plan
Comprehensive Plan Impact on Community Review
June 30, 2026
13
a. Projected traffic increase may exceed capacity of existing road network.
As part of this action, there are no projected traffic increases. Future development
projects are required to create a traffic impact analysis, where appropriate. Where future
development is proposed, the zoning and subdivision codes include protections to
minimize impacts on road networks, and the Planning Board will review for these impacts,
where applicable.
Based on medium-density housing development patterns and uses (single-family, two-
family, townhomes, and accessory dwelling units), the project may add some additional
vehicles to the road network. However, the plan includes alternative transportation
options, such as walking, biking, and transit, to reduce vehicle miles traveled per
household.
The Town Board coordinated a review of this draft with interested agencies, including
Tompkins County, the New York State Department of Transportation, and numerous
others, and received no comments about transportation impacts.
Therefore, the Town Board determines there will be “no to small impact.”
b. The proposed action may result in the construction of paved parking area for 500 or
more vehicles.
Because this action involves no changes to development regulations and includes only
the adoption of a policy document, it will not result in the construction of a paved
parking area. Future development is not envisioned to create large-scale housing or
commercial development resulting in a parking area of 500 or more.
The Comprehensive Plan states that the Town should encourage shared parking. The
Town also does not have minimum parking requirements, which results in excessive
parking.
TOWN OF ULYSSES TOWN BOARD
STATE ENVIRONMENTAL QUALITY REVIEW (SEQR) FULL ENVIRONMENTAL ASSESSMENT FORM (EAF) PART 3
EVALUATION OF THE MAGNITUDE AND IMPORTANCE OF THE PROJECT IMPACTS AND DETERMINATION OF
SIGNIFICANCE
Town of Ulysses Comprehensive Plan
Comprehensive Plan Impact on Community Review
June 30, 2026
14
The Town Board coordinated a review of this draft with interested agencies, including
Tompkins County, the New York State Department of Transportation, and numerous
others, and received no comments regarding transportation impacts.
Therefore, the Town Board determines there will be “no to small impact.”
c. The proposed action will degrade existing transit access.
Existing transit service, such as TCAT, is limited in Ulysses. Development patterns will not
degrade existing access to established roads or bus services. The future land use
envisions development nearby existing TCAT routes and stops to increase transit access.
The Town Board coordinated a review of this draft with interested agencies, including
Tompkins County, the New York State Department of Transportation, and numerous
others, and received no comments regarding transportation impacts.
Therefore, the Town Board determines there will be “no to small impact.”
d. The proposed action will degrade existing pedestrian or bicycle accommodations.
The Comprehensive Plan identified ways to improve pedestrian and bicycle
accommodations and road safety. Transportation objective T-O-1.1 states, “Support and
provide additional opportunities for people to utilize alternative modes of transportation,
including public transit, bicycles, and walking.
The Town Board coordinated a review of this draft with interested agencies, including
Tompkins County, the New York State Department of Transportation, and numerous
others, and received no comments about transportation impacts.
Therefore, the Town Board determines there will be “no to small impact.”
e. The proposed action may alter the present pattern of movement of people or goods.
TOWN OF ULYSSES TOWN BOARD
STATE ENVIRONMENTAL QUALITY REVIEW (SEQR) FULL ENVIRONMENTAL ASSESSMENT FORM (EAF) PART 3
EVALUATION OF THE MAGNITUDE AND IMPORTANCE OF THE PROJECT IMPACTS AND DETERMINATION OF
SIGNIFICANCE
Town of Ulysses Comprehensive Plan
Comprehensive Plan Impact on Community Review
June 30, 2026
15
The proposed action will not change how people and goods travel through the area. New
development isn’t expected to change the road network. Likewise, there are no significant
commercial or industrial developments.
The Town Board coordinated a review of this draft with interested agencies, including
Tompkins County, the New York State Department of Transportation, and numerous
others, and received no comments regarding transportation impacts.
Therefore, the Town Board determines there will be “no to small impact.”
14. Impact on Energy
Because this action involves no physical changes and includes only the adoption of a policy
document, there will be no direct impact on energy usage.
Impacts on energy will be evaluated on a project by project basis in the future and will be
subject to SEQR as necessary. These projects will also be reviewed by the local utility
agency for impacts and required investments in the energy infrastructure.
The Comprehensive Plan includes a policy to improve energy efficiency in existing
residences and commercial buildings. The plan also includes climate change and resiliency,
with an objective related to sustainable development practices, such as recycling
strategies (CR-O-3.2). A number of policies are directed towards energy efficiency and
renewable energy. Additionally, by encouraging infill development or development
around existing developed areas, there will be less energy consumed and less need to
expand infrastructure. There are no proposed large energy users in the plan.
Therefore, the Town Board has checked “no.”
TOWN OF ULYSSES TOWN BOARD
STATE ENVIRONMENTAL QUALITY REVIEW (SEQR) FULL ENVIRONMENTAL ASSESSMENT FORM (EAF) PART 3
EVALUATION OF THE MAGNITUDE AND IMPORTANCE OF THE PROJECT IMPACTS AND DETERMINATION OF
SIGNIFICANCE
Town of Ulysses Comprehensive Plan
Comprehensive Plan Impact on Community Review
June 30, 2026
16
15. Impact on Noise, Odor, and Light.
Because this action involves no physical changes and includes only the adoption of a policy
document, there will be no direct impact on noise, odor, and light. Generally, noise, odor,
and light levels will not change from current levels.
The Comprehensive Plan does not contemplate major industrial or commercial users and
potential impacts from them. Blasting is not foreseen or included in the Comprehensive
Plan. Future impacts on noise, odor, and light will be evaluated on a project by project
basis in the future and will be subject to SEQR as necessary. They will further be subject
to Town regulations, such as zoning, which provides standards for outdoor lighting to
reduce glare and light trespass. The Environmental and Natural Resource policy, EN-P-
1.1.7, recommends adopting design standards for commercial and residential properties
to preserve dark skies. Also, zoning requires Planning Board review in certain instances,
which would evaluate impacts to noise, odor, and lighting.
Therefore, the Town Board has checked “no.”
16. Impact on Human Health.
Because this action involves no physical changes and includes only the adoption of a policy
document, there will be no direct impact on human health from exposure to sources of
contaminants. Additionally, there are no known remediation sites in the Town.
Future development will be subject to compliance with applicable SEQR regulations,
including consideration of chemical applications, and subject to necessary environmental
permits.
Therefore, the Town Board has checked “no.”
17. Consistency with Community Plans.
TOWN OF ULYSSES TOWN BOARD
STATE ENVIRONMENTAL QUALITY REVIEW (SEQR) FULL ENVIRONMENTAL ASSESSMENT FORM (EAF) PART 3
EVALUATION OF THE MAGNITUDE AND IMPORTANCE OF THE PROJECT IMPACTS AND DETERMINATION OF
SIGNIFICANCE
Town of Ulysses Comprehensive Plan
Comprehensive Plan Impact on Community Review
June 30, 2026
17
The proposed action is the adoption of a new land use plan. This new plan’s future land
use components are generally consistent with the currently adopted future land use
plan and align with existing land use patterns. Upon assessment of the existing Ulysses
Land Use and Land Cover map (Figure LR-2), State Route 96 and Cold Springs Road are
occupied by residential housing. This indicates that housing patterns exist at these
locations and are not unrealistic to current land use conditions or the Future Land Use
Map. The lakeshore and conservation areas are recognized in this Comprehensive Plan
and continue to preserve low-density housing, agriculture, or environmental
conservation. Parkland is also recognized and protected. Agriculture continues to be
preserved throughout the Town.
According to the Comprehensive Plan, the 2024 population of Ulysses was 4,894. A 5%
increase results in 245 additional people. The Comprehensive Plan will not cause the
population to grow by more than 5%, as much of this growth is baked into regional
housing demand. The Comprehensive Plan attempts to accommodate existing housing
demand and shifts development patterns to minimize impacts from the new population.
It does this by favoring new housing in locations with existing infrastructure, minimizing
the need to extend infrastructure into new land.
An analysis was done by the Town Planner comparing existing zoning uses with the uses
included in the Future Land Use Plan. There were no new uses that did not fit into the
existing zoning code. The development patterns in the adopted 2009 and proposed 2045
Future Land Use Plans are generally similar. The Lakeshore and Conservation categories
have stayed relatively the same when comparing the maps. The Conservation Character
Area is also recognized on both maps in the north-western section of Ulysses. Parkland
continues to be protected. Similar to the 2009 Future Land Use Plan, housing is focused
around the Village of Trumansburg and the Hamlet of Jacksonville. Although housing
isn’t an obvious use in the 2009 Future Land Use Plan, the Agricultural land use allows
single-family and cluster residential development as appropriate.
In developing the Comprehensive Plan, the Town considered adopted local, county, and
regional land use plans and attempted to incorporate them into the Comprehensive Plan
to ensure consistency. The Tompkins County Comprehensive Plan encourages nodal
development to avoid housing sprawl. The Town’s Comprehensive Plan encourages nodal
development, particularly around the Hamlet of Jacksonville.
TOWN OF ULYSSES TOWN BOARD
STATE ENVIRONMENTAL QUALITY REVIEW (SEQR) FULL ENVIRONMENTAL ASSESSMENT FORM (EAF) PART 3
EVALUATION OF THE MAGNITUDE AND IMPORTANCE OF THE PROJECT IMPACTS AND DETERMINATION OF
SIGNIFICANCE
Town of Ulysses Comprehensive Plan
Comprehensive Plan Impact on Community Review
June 30, 2026
18
This action, adopting the Comprehensive Plan, will not cause secondary development
impacts because there are no first-order development impacts.
Therefore, the Town board has checked “no.”
18. Consistency with Community Character.
Because this action involves no physical changes and includes only the adoption of a policy
document, there will be no direct impact on community character.
Existing facilities, structures, and areas of historic importance will not be replaced or
eliminated, as the plan recognizes hamlets and historically sensitive sites in the Future
Land Use Plan. Additionally, a plan chapter is dedicated to the built environment and
historic preservation.
The development patterns envisioned in the Comprehensive Plan would reduce the
demand for community service. This is done by minimizing service area expansion for
police, fire, and school busing. The Town Board coordinated a review of this draft with
interested agencies, including Tompkins County, Trumansburg and Ithaca School Districts,
and numerous others, and received no comments about impacts on community services.
The Housing chapter thoroughly discusses the importance of affordable housing and
provides many related goals and objectives. For example, H-G-1 includes making sure
housing opportunities are accessible, attractive, and affordable for all income levels.
The Comprehensive Plan will not interfere with the use and enjoyment of public
resources because it envisions their protection, enhancement, and expansion.
The Comprehensive Plan is consistent with the architectural scale and character of the
Jacksonville and Waterburg hamlets. It further preserves the existing natural landscape
as much as possible.
Therefore, the Town board has checked “no.”
TOWN OF ULYSSES TOWN BOARD
STATE ENVIRONMENTAL QUALITY REVIEW (SEQR) FULL ENVIRONMENTAL ASSESSMENT FORM (EAF) PART 3
EVALUATION OF THE MAGNITUDE AND IMPORTANCE OF THE PROJECT IMPACTS AND DETERMINATION OF
SIGNIFICANCE
Town of Ulysses Comprehensive Plan
Comprehensive Plan Impact on Community Review
June 30, 2026
19
19. Impacts on Disadvantaged Communities
Because this action involves no physical changes and includes only the adoption of a policy
document, there will be no direct impact on disadvantaged communities. According to
the New York State Disadvantaged Community Assessment Tool, there are no
disadvantaged communities in Ulysses.
The plan includes a section, Housing, which discusses accessible, affordable, and inclusive
housing for all demographics. It also discusses engaging historically underrepresented
communities when implementing land use and housing policies. There are numerous
Housing goals, objectives, and policies that discuss housing for various demographics and
fair and equal housing for all.
Therefore, the Town board has checked “no.”
20. Future Physical Climate Risk
Because this action involves no physical changes and includes only the adoption of a
policy document, there will be no direct impact on human or ecological communities.
Based on FEMA flood mapping, the plan will not impact 100-year or 500-year
floodplains. Additionally, the plan addresses reducing flood impacts through plan policy.
The plan includes a section, Climate and Resiliency, which discusses climate change and
its respective impacts on natural resources and the broader community. The plan includes
policies to prepare for climate change, identify vulnerable ecological and social
populations, and reduce greenhouse gas emissions.
The Town received a New York State Department of Environmental Conservation Climate
Smart Communities Grant and dedicated an entire comprehensive plan chapter to climate
change. Throughout the plan, sustainability policies are incorporated.
TOWN OF ULYSSES TOWN BOARD
STATE ENVIRONMENTAL QUALITY REVIEW (SEQR) FULL ENVIRONMENTAL ASSESSMENT FORM (EAF) PART 3
EVALUATION OF THE MAGNITUDE AND IMPORTANCE OF THE PROJECT IMPACTS AND DETERMINATION OF
SIGNIFICANCE
Town of Ulysses Comprehensive Plan
Comprehensive Plan Impact on Community Review
June 30, 2026
20
The Town Board coordinated a review of this draft with the New York State Department
of Environmental Conservation, which was identified as a potential lead agency. The Board
did not receive comments about climate change from them.
Therefore, the Town board has checked “no.”