HomeMy WebLinkAbout2024-04-23-TB-FINAL-minutes1
TOWN BOARD MEETING
Town of Ulysses
April 23, 2024
The meeting was held in person at the Town Hall at 10 Elm St., Trumansburg NY as well as via Zoom
videoconference. Notice of Town Board meetings are posted on the Town’s website and Clerk’s board.
Video recordings of meetings are available on Youtube at
https://www.youtube.com/channel/UCWVIs--g9CpHIxdk9YxZyPw.
CALL TO ORDER:
Ms. Olson called the meeting to order at 7pm.
ATTENDANCE:
TOWN OFFICIALS:
Supervisor- Katelin Olson
Board members- Mary Bouchard, Michael Boggs, Rich Goldman, Liz Weatherby
Town Clerk- Carissa Parlato
Bookkeeper- Blixy Taetzsch
Second Deputy Supervisor/Budget Officer- Michelle E. Wright
MEMBERS OF THE PUBLIC:
In person-
Roxanne Marino, Linda Liddle, Becky Sims (RCAP Solutions representative), Amy Panek,
Jennifer Ge, Alicia Long
Via Zoom-
Matt McKenna (engineer, MRB Group), Maddy Vogel
APPROVAL OF AGENDA:
Motion:
Ms. Bouchard requested to add discussion of the town providing insurance for a skatepark facilitated
by Mr. Woodring. Ms. Olson and Ms. Wright responded that it would not be currently covered and
would be odd for the town to cover someone else’s program but would gather more information.
Mr. Boggs moved to approve the agenda as presented. This was seconded by Ms. Weatherby and
passed unanimously.
PRIVILEGE OF THE FLOOR:
(none)
PRESENTATION: BECKY SIMS, RCAP SOLUTIONS:
Ms. Sims shared a presentation on the results from the Water Source Protection Plan Committee’s
(WSPPC) water survey (see attached). Highlights of her presentation included:
• Background on the survey
• How it was distributed
• Who responded- 348 households
2
• Results:
o Well water is town residents’ primary source of drinking water
o Most don’t know how old or how deep their well is
o Water quantity- 13% did not always have enough
o Quality- avg rating is fair but mostly weighted to poor and very poor quality
▪ Some quality issues could have health impacts
▪ Treatment- most are spending money to treat their water
o Municipal water interest- 60% interested with willingness to pay various amounts
o Concerns about the water supply- considerable concern mostly with manure &
fertilizer or drought/flood
The board thanked Ms. Sims.
Mr. Goldman inquired about remedies for fertilizer issues from farms. Ms. Sims said it can be hard to
demonstrate fertilizer is a cause and also hard to make a change due to NYS not regulating it.
However, the county health dept can help if manure is spread close to a well.
Ms. Weatherby added that in comp plan interviews the consultants suggested that education for
farmers is helpful. Ms. Sims also recommended reaching out to the soil & water office for help.
Ms. Marino said that the WSPPC will be getting a new NY Rural Water specialist…
She responded to this survey and the protection plan is public education and information that some
things can be tested for every year (e-coli & nitrates).
PRESENTATION: 2023 FINANCIAL YEAR REVIEW:
Ms. Wright & Ms. Taetzsch shared a presentation (see attached). Ms. Wright said that this analysis is
hand-crafted so the board should let her know if other information is desired.
Discussion of end of year estimates.
Highlights:
• Results of operations
• Reserves
• Fund balance
• Capital assets
• Analysis of each fund
OLD BUSINESS:
ARPA PROCUREMENT AND PROCESS UPDATE; TENTATIVE ALLOCATION OF FUNDS
Ms. Olson reminded everyone that the board identified 6 items to investigate further with regards to
whether it could be funded by ARPA, knowing that we will not be able to fund everything. (See memo
attached.)
Mr. McKenna shared information on MRBs estimates (both pervious and impervious pavement) for
the town hall parking lot.
3
He clarified that “utility” referred to the power infrastructure for the parking lot but not necessarily
light fixtures.
They don’t see impervious pavement very often due to the associated maintenance- it needs to be
swept/cleaned or the surface will plug.
Normal asphalt rebuild will require 16-18” excavation but permeable/pervious will require about 3-4
ft of stone sub-base as well as reservoir and storage of the water that it traps. Geotechnical tests will
be needed to ensure that the soil will take the water/ water will infiltrate the soil. Also requires
trucking to remove all the material.
Mr. Boggs said that asphalt gets recycled nowadays so it is more sustainable.
Mr. Mckenna said that you cannot add sand or salt for ice to the pervious pavement.
Ms. Olson said that she recommends that a new non-permeable pavement parking lot gets funded by
ARPA and the town starts work on this project ASAP. Legal costs will also need to be incurred due to
the shared portions of the lot. She also suggests that the remaining funds be spent on known security
upgrades.
Mr. Boggs would prefer to seed each project rather than using it all for the parking lot. Ms. Olson said
that the parking lot will take up a lot of administrative time and it is not reasonable to try to work on
all the projects at once and the other projects can be budgeted for or by using fund balance.
Mr. Goldman, Ms. Bouchard agree to prioritize the parking lot. Ms. Weatherby is concerned that the
parking lot estimate could increase as time goes on.
Ms. Olson requested permission to start on the parking lot tomorrow and once costs are confirmed
then make decisions on other projects if there is money left over.
Mr. Goldman moved to commit the funds to the parking lot
Mr. Boggs said that this project doesn’t benefit that many people. Ms. Olson noted that the parking
lot offers the only ADA accessible entrance to the town hall.
RESOLUTION #77 of 2024:
RESOLVED that the Ulysses Town Board directs the Town Supervisor to oversee the necessary
scoping and contractual work necessary to proceed with the parking lot project as identified
through the American Rescue Plan Act (ARPA) review process.
Moved: Mr. Goldman Seconded: Ms. Bouchard
Friendly amendment to language.
Olson aye
Boggs aye
Bouchard aye
4
Goldman aye
Weatherby aye
Vote: 5-0
Date Adopted: 4/23/24
NEW BUSINESS:
CONSENT AGENDA OF RESOLUTIONS # 78-79:
RESOLUTION #78 OF 2024: AUTHORIZATION TO SIGN LETTER OF INTENT FOR VOLVO L90H
LOADER
WHEREAS, the Highway Superintendent has received a quote for a Volvo L90H Loader, dated
2/16/2024 for the total purchase price of $141,431, for the replacement of the 2019 Case
Loader (# NJF244037), inclusive of all required accessories, which is a planned purchase per
the Highway Capital Equipment Plan; and
WHEREAS, the source for this purchase and quote is via Sourcewell and through a vendor who
has been awarded a New York State Piggyback Contract through the NYS Office of General
Services Procurement Services (contract # PC69437), and per the Town ’s Procurement Policy
and General Municipal Law §103(3), purchases made using County or State contracts are
exceptions to competitive bidding requirements, now therefore be it
RESOLVED that the Town Board of the Town of Ulysses authorizes the Town Supervisor to sign
a letter of intent to purchase the Volvo L90H loader.
RESOLUTION #79 OF 2024: APPOINTMENT AND ESTABLISHMENT OF PAY RATE FOR
RECREATION SPECIALIST
RESOLVED, that the Ulysses Town Board approves hiring Zak Kozlowski to fill the open
Recreation Specialist position at a pay rate of $22/hour for an average of 15 hours per week
beginning April 29, 2024; and be it
FURTHER RESOLVED, that the probationary period is set for one year after date of hire.
Moved: Mr. Goldman Seconded: Ms. Bouchard
Olson aye
Boggs aye
Bouchard aye
Goldman aye
Weatherby aye
Vote: 5-0
Date Adopted: 4/23/24
APPROVAL OF GENERIC ESCROW AGREEMENT FOR DEVELOPMENT OR PLANNING PROJECTS
RESOLUTION #80 OF 2024: APPROVAL OF GENERIC ESCROW AGREEMENT FOR
DEVELOPMENT OR PLANNING PROJECTS
5
RESOLVED, that the Ulysses Town Board approves the generic escrow agreement for
development or planning projects in the Town of Ulysses, which enables professional and/or
legal services (i.e. consultant costs) to be paid for by the applicant per Town of Ul ysses Zoning
Code § 212-6 “Fees for permits.”
Moved: Mr. Goldman Seconded: Ms. Bouchard
Olson aye
Boggs aye
Bouchard aye
Goldman aye
Weatherby aye
Vote: 5-0
Date Adopted: 4/23/24
OLD BUSINESS:
FUND BALANCE POLICY
Ms. Taetzsch shared a draft policy. The board discussed the policy, with plans of bringing back a final
version for approval.
JUSTICE COURT CONSOLIDATION – CONSIDERATION TO HOLD A PUBLIC HEARING
Ms. Olson noted that a public hearing is not required but is important to get public feedback.
She added that NYS will provide a judge is out for a longer term.
RESOLUTION # 81 OF 2024: SCHEDULING PUBLIC HEARING ON THE REDUCTION OF THE
NUMBER OF TOWN COURT JUSTICES FROM TWO TO ONE
WHEREAS, the Town of Ulysses currently has two Justices for the Town Court. The Town
Board has determined that it will be in the best interests of the Town to reduce the number of
Town Court Justices from two to one due to a reduction in revenue and reason able case load
for a single jurist, effective upon the expiration of Justice Thomas Schlee’s current term on
December 31, 2024; and
WHEREAS, the Town Board desires to hold a public hearing with respect to the proposed
reduction as stated hereinabove.
NOW, THEREFORE, BE IT RESOLVED that a public hearing will be held by the Town Board of
the Town of Ulysses with respect to the proposed reduction of the number of Town Court
Justices on May 14, 2024 at 7 p.m.; and it is further
RESOLVED, that the Town Clerk is hereby authorized and directed to cause public notice of
said hearing to be given as provided by law.
Moved: Mr. Goldman Seconded: Mr. Boggs
Rollcall vote called
Olson aye
6
Boggs aye
Bouchard aye
Goldman aye
Weatherby aye
Vote: 5-0
Date Adopted: 4/23/24
PROPOSED AGRICULTURAL DISTRICT ALTERATIONS – CONCERNS BY ULYSSES PLANNING BOARD
Ms. Olson said that a property on Taughannock Blvd. in the town’s Conservation District is slated to
be added to NYS Ag District #2. She said th at she spoke with Legislator Koreman and at the 5/7
county meeting a final determination will be made by legislature.
Ms. Weatherby said that she believed that the town’s zoning (local law) will still be in effect even if
the property it is added to the state district unless the property owner seeks an exemption from NYS.
Other board members questioned whether this was accurate. Ms. Olson agreed to get clarity and
advocate whatever the board’s preference is to the county.
UPCOMING EVENTS
May 14 – Regular Meeting, 7pm @ Town Hall
May 27 – Town Offices Closed, Memorial Day
May 28 – Regular Meeting, 7pm @ Town Hall
June 6- All staff training
APPROVAL OF MINUTES:
RESOLUTION #82 OF 2024: APPROVAL OF MINUTES:
RESOLVED, that the Ulysses Town Board approve the meeting minutes as presented from
4/9/24 Regular Meeting.
Moved: Mr. Goldman Seconded: Mr. Boggs
Olson aye
Boggs aye
Bouchard aye
Goldman aye
Weatherby aye
Vote: 5-0
Date Adopted: 4/23/24
PRIVILEGE OF THE FLOOR (3 min limit per person):
Ms. Liddle suggested for ARPA funds that it would be helpful to notify every group who is hoping to
get funded that the board will consider their projects in 2025.
7
Ms. Marino thanked the board for thorough ARPA considerations and suggested that the well testing
project can be paid for from the B fund. She added that if we qualify for Clean Energy funding we
could receive up to $60k; and we may be able to get funding for stormwater as well.
ADJOURN:
Mr. Goldman made a motion to adjourn at 9:22pm. This was seconded by Ms. Bouchard and passed
unanimously.
Respectfully submitted by Carissa Parlato, Town Clerk
5/9/24
8
APPENDIX:
(See attached pages)
Drinking Water Survey Results
Becky Sims, MPA
Community Specialist
RCAP Solutions
Town of Ulysses
April 23, 2024
Background
•Purpose: Inform Town planning –DWSP2, Comprehensive Plan, infrastructure
•Method: Postcard mailer with online survey link to 1,334 property owners –Town only, no Village
•Town Water Source Protection Plan Committee
•28 question online survey –Survey123; paper copies at Town Hall
•Survey open 10/31/23 –1/21/24 2
Responding Households
3
Average household size is 2.3 people
348 Households Response Rate = 26%
Results – Water Source
4
217
86 55
23 14 9 1
54
260
0
55 30 3 7 2 9
0
50
100
150
200
250
300
Well Bottled
Water
Municipal
Water
Direct
fromCayuga
Lake
Delivered Spring Rain Water Two or
more
Water Source
Drinking Water Household Water
Results - About the Well
A lot is unknown!
5
What is the depth of your well?
Percentage of Responses (#)
10 feet or less 3% (10)
11-49 feet 10% (28)50-99 feet 15% (43)100-199 feet 16% (47)More than 200 feet 9% (27)
Unknown 47% (136)(N=289; No response = 59)
What year was the well constructed?
Percentage of Responses (#)
1900 or earlier 1% (4)1901-1949 2% (6)1950-1969 7% (19)1970-1989 16% (47)1990-1999 13% (36)After 2000 18% (52)Unknown 44% (126)(N=287; No response = 61)
Results – Water Quantity
6
Yes
87%
No
13%
Do you always have enough drinking water?
Yes
No
Results – Water Quality
7
40
70
88
75
54
0
20
40
60
80
100
Excellent Good Fair Poor Very poor
How would you rate the quality of your untreated
water?
Results - Water Quality
8
61%
48%47%
33%28%27%
19%16%10%9%7%4%3%3%2%
0%
10%
20%
30%
40%
50%
60%
70%
Does your untreated water have any of the following
problems?
Results – Treatment and Cost
9
More respondents treat household water (69%) than treat drinking water (60%)
50
83
67 69
29
20
10
20
30
40
50
60
70
80
90
Nu
m
b
e
r
o
f
R
e
s
p
o
n
s
e
s
Amount spent annually on
water supply
48% (161 respondents) made a major investment in the water system in the last 10 years, with costs averaging $4,445.
Results – Municipal Interest
10
Uninterested
23%
Neutral
17%Somewhat
interested
21%
Very
interested
39%
How interested are you in changing
your water source to a municipal water system, if available?
105 101
19 25 9
47
0
20
40
60
80
100
120
How much would you be willing to
pay for municipal water service per
year?
N = 313 N = 306
Results - Concerns
11
26
30
30
53
58
69
71
76
102
145
149
0 20 40 60 80 100 120 140 160
Other
Oil or gas wells
Salt storage or application
Harmful Algal Blooms
N/A No concerns
Lack of water supply due to pumping of…
Contamination from septic systems
Chemicals or petroleum contamination
Pesticide storage or application
Drought and/or flood
Manure and fertilizer storage or applications
Number of Responses
Please indicate if you are concerned with the
following issues affecting your water supply:
Questions?
Becky Sims, MPA
Community Specialist
RCAP Solutions
607-233-3824
bsims@rcapsolutions.org
12
Town of
Ulysses
2023 FINANCIAL YEAR
OVERVIEW
4/23/20242023 FINANCIAL YEAR REVIEW
4/23/20242023 FINANCIAL YEAR REVIEW
2023 Financial Year in Review
Using past two years as template for annual review
Broad overview funds included: A, B, DA, DB, SM, SW3
Questions, follow up plan
AFR (formally known as the AUD) submitted on time at the end
of February
Independent audit
We will be scheduling a time when the auditors can come to a Town
Board meeting
Across Funds: Results of Operations
4/23/20242023 FINANCIAL YEAR REVIEW
EOY Estimate Actual Difference Difference as
% of Actual EOY Estimate Actual Difference Difference as
% of Actual
A 1,132,928$ 1,061,501$ 71,427$ 6.73%1,049,827$ 1,125,922$ 76,095$ 6.76%
B 299,972$ 275,156$ 24,816$ 9.02%233,096$ 250,348$ 17,252$ 6.89%
DA 603,929$ 633,710$ (29,781)$ -4.70%518,488$ 559,593$ 41,105$ 7.35%
DB 324,951$ 294,213$ 30,738$ 10.45%358,512$ 361,323$ 2,811$ 0.78%
SM 449,771$ 449,771$ -$ 0.00%440,050$ 457,354$ 17,304$ 3.78%
SW3 409,897$ 384,980$ 24,917$ 6.47%383,482$ 387,884$ 4,402$ 1.13%
Appropriations
does not include additions to reserves
Revenue
does not include reserve appropriations
Cells in green have been corrected since 4/19/24 version of slides
Across Funds: Reserves
4/23/20242023 FINANCIAL YEAR REVIEW
Fund
12/31/23
Total
Reserves
2023
Additions
(includes
investment
income)
2023
Appropriated
2024 Budgeted
Reserve
Additions
2024 Budgeted
Reserve
Appropriations
A (General Townwide)525,564$ 259,142$ 10,196$ 6,000$ -$
B (General Part Town)93,994$ 3,435$ -$ 5,000$ -$
DA (Highway Townwide)727,326$ 144,090$ -$ -$ 117,754$
DB (Highway Part Town)187,255$ 53,672$ -$ -$ -$
SW3 (Water District 3)61,553$ 1,430$ -$ 29,500$ -$
SM (EMS)
Across Major Funds 1,595,692$ 461,769$ 10,196$ 40,500$ 117,754$
2023 Reserve Activity 2024 Budgeted Reserve Activity
n/a n/a
Across Funds: Fund Balance
4/23/20242023 FINANCIAL YEAR REVIEW
12/31/23 UAFB
Actual
2024
Appropriations*
12/31/23 UAFB
as % of '24
Appropriations*
A 438,943$ 1,208,416$ 36%
B 241,093$ 360,797$ 67%
DA 211,917$ 822,761$ 26%
DB 196,839$ 384,800$ 51%
SM 124,704$ 440,255$ 28%
SW3 59,486$ 210,969$ 28%
*Appropriation total does not include debt payment
or reserve additions
Unappropriated Fund Balance
(UAFB)
2018 2019 2020 2021 2022 2023
A (General Townwide)30%36%54%55%34%36%
B (General Part Town)43%50%49%52%56%67%
DA (Highway Townwide)28%44%58%26%23%26%
DB (Highway Part Town)47%39%51%30%34%51%
SW3 (Water District 3)*46%44%46%35%28%28%
SM (EMS)28%37%29%29%30%28%
Historic Comparison: Unappropriated Fund Balance (UAFB) as % of Appropriations
Across Funds: Capital Assets
4/23/20242023 FINANCIAL YEAR REVIEW
12/31/2022 12/31/2023
Beginning Ending
Fixed Assets Balance Additions Deletions Adjustments Balance
Land 173,569.00$ 173,569.00$
Buildings 932,185.38$ 932,185.38$
Equipment 1,499,416.46$ 299,619.77$ (48,831.40)$ 1,750,204.83$
Infrastructure 6,546,401.81$ 111,295.21$ 6,657,697.02$
Total 9,151,572.65$ 410,914.98$ (48,831.40)$ -$ 9,513,656.23$
12/31/2022 12/31/2023
Beginning Ending
Accumulated Depreciation Balance Additions Deletions Adjustments Balance
Buildings 409,928.64$ 43,451.66$ 453,380.29$
Equipment 962,177.44$ 149,052.64$ (48,831.40)$ 1,062,398.68$
Infrastructure 4,199,096.68$ 140,185.29$ 4,339,281.97$
Total 5,571,202.76$ 332,689.59$ (48,831.40)$ -$ 5,855,060.95$
4/23/20242023 FINANCIAL YEAR REVIEW
A Fund: Townwide
Program/services highlights
Special election
IT upgrade
Grant administration
Active grants: County grants for rec program and jville park, DEC grants for culvert engineering report and comp
plan update, BRIDGE NY Curry Rd.
Continued development of community organization funding process
Continued development of multiyear planning and budgeting processes
LDC membership
Youth Development
YEP PS bubble for pandemic catch up
Transition to YD programming in-house
Recreation programming continued to grow with expanded courses throughout the year
(including adult programs) and increased summer camp enrollment
4/23/20242023 FINANCIAL YEAR REVIEW
A Fund: Townwide
Relative to the 2023 Modified Budget
Areas of underspending
Town Hall Eq
Over-earning revenue categories
Sales tax, Rec Dept. fees
4/23/20242023 FINANCIAL YEAR REVIEW
B Fund: Outside Village
Program/services highlights
Comp plan update
Administrative support
Systems and communications
Relative to the 2023 Modified Budget
Areas of underspending
B fund vehicle, Comp Plan CE,
Over-earning revenue categories
Sales tax, building permits
4/23/20242023 FINANCIAL YEAR REVIEW
DA Fund: Townwide Highway
Program/services highlights
Snow removal, equipment capital planning and purchases
Relative to the 2023 Modified Budget
Areas of underspending
Reminder: highway funds cannot have contingency lines
Health insurance
Snow Removal
Over Time
2023 OT: 205.50 hours
2022 OT: 343.5 hours
2021 OT: : 169 hours
Over-earning revenue categories
Sales tax, equipment sales
4/23/20242023 FINANCIAL YEAR REVIEW
DB Fund: Highway
Program/services highlights
Long term improvements to town-owned roads,
culvert and ditch maintenance, paving and culvert
capital planning
Relative to the 2023 Modified Budget
Areas of underspending
CHIPs rolls over
Over-earning revenue categories
Sales tax
4/23/20242023 FINANCIAL YEAR REVIEW
SM Fund
Ambulance revenue (SM 1289)
Budgeted = $89,000
EOY Estimate during budget season = $87,519
2023 Actual = $104,823
2023 3 yr average 5 yr average
73,802$ 110,473$ 76,375$ 81,209$ 89,678$ 104,823$ 91,903$ 92,512$
2018 2019 2020 2021 2022
Ambulance SM Tax Levy (SM1001)
2023 3 yr average 5 yr average
251,907 341,031 332,134 337,116 339,937 352,531 343,195$ 340,550$
2018 2019 2020 2021 2022
4/23/20242023 FINANCIAL YEAR REVIEW
SW3 Fund
Service highlights
Radio meters installed for most of district
Software upgrades
Areas of underspending
Budgeted reserve use unneeded due to operational
underspending in other lines (i.e. no water main break,
etc.)
The Supervisor’s Office has fulfilled the resolution (3/12/24) of the Town Board to “oversee the investigation
of the following projects for cost determinations per the Town’s Procurement Policy for potential
expenditures of American Recovery Fund Act monies” for six projects. Enclosed in the packet for the 4/23/24
Town Board meeting are the estimates and early scoping materials for all six projects:
1) Town Hall parking lot replacement;
2) Design and installation of generator at the Highway Barn;
3) Stormwater plan;
4) Transition funds for the Trumansburg/Ulysses Summer Camp to Camp Barton in 2025;
5) Private well testing program;
6) Town Hall safety assessment.
Currently there is $229,449 available in ARPA funds that need to be allocated by the Town Board in this
process.
The recommendation from the Town Supervisor is that the Town Board proceeds with the development of
full scoping materials and a Request for Proposals document for the replacement of the parking lot. It is
recommended that any additional ARPA funds, if any remain after contractual obligations on the parking lot
construction, be allocated to identify security upgrades at Town Hall.
The parking lot replacement would include:
- removal of current pavement
- the installation of either permeable or non-permeable pavement in full or in part;
- the installation of stormwater controls;
- installation of infrastructure for lighting.
Estimates of this work range from approximately $189,260 - $309,440, excluding an initial estimate of about
$5,000 in legal costs associated with the unique configuration of the property related to its complicated
ownership.
Reasons to proceed with the parking lot replacement project include:
--Board prioritization: In discussions on 3/12/24, the Town Board identified this as the replacement of the
parking lot, with necessary safety and stormwater upgrades, as the proposal of the greatest need.
--Cost estimates would nearly meet or exceed the balance of ARPA funds available: Proceeding with this
project efficiently will allow the Town Board to determine if any APRA funds would be available for allocation
to another project before the end of 2024, as required by the terms of the funding.
--Danger to the public: Deferred maintenance for more than 10+ years has resulted in serious deterioration of
the space, and puts at risk members of the public, staff, and vehicles that utilize this entrance.
--Safe accessibility: ARPA funds will be used to install the Town’s only ADA accessible entrance of the parking
lot, further necessitating replacement of the space to improve public access.
--Insurance concerns: The Town’s insurance has raised concerns related to insufficient lighting (safety risk)
and deterioration (risk to people and vehicles).
--Increasing repair costs: Due to inflation, supply chain constraints, and contractor demand, the broad
estimate from 2021 was $100,000 for non-permeable pavement, while the 2024 estimate is ~$189,000. Using
all permeable pavement (if possible) will cost ~$300,000. Further delay on this project will only lead to
increased costs to the Town, as the persistent inflation rates do not indicate a pending recession and potential
drop in costs for infrastructure.
--Significant time needed to get to construction contract: Completing the contractual work necessary before
the end of 2024 for a project this complex requires moving swiftly to go into the formal scoping and RFP
phases. If the Town Board would like to consider permeable pavement (Please see accompanying timeline
outlining the process to bring this project to completion.)
--Savings to the taxpayer for a required project: Previous Town Boards did not specifically save for the
replacement of the parking lot and it is unlikely to be an appealing grant-funded project, so the use of ARPA
funds will have a direct benefit to Town taxpayers. Alternatives to paying for this project include
unappropriated fund balance from the A Fund, the A Fund Repair Reserve (A882 balance of $$80,986) or the A
Fund Capital Reserve (A878 balance of $271,853). Important to note here is that the developing capital plan
for the Town Hall will require the use of both of those reserves. Overages beyond any ARPA funds would also
need to come out of these lines.
Reasons to proceed with security upgrades with any remaining ARPA funds:
--Assessments of internal security deficiencies have been previously circulated to the Town Board members.
Security and insurance professionals have visited the property and made recommendations about how to
increase the safety of Town Hall staff and members of the public, in light of concerning incidents that have
occurred in Town Hall in 2024.
--Any remaining ARPA funds left after the scoping and design phases of the parking lot replacement have been
completed will be quickly and appropriately allocated to address known deficiencies that will otherwise be
paid for out reserves, contingency and/or fund balance in 2024 and 2025.