HomeMy WebLinkAbout2024-04-02 PB Final Minutes
Planning Board Meeting Minutes Page 1 of 2
April 02, 2024
Planning Board
Zoom Hybrid Meeting
Meeting Minutes
April 02, 2024
Approved: April 16, 2024
Board Members Present: Mo Klein, Linda Liddle, Bart Gragg, Karl Klankowski
Board Members Present on Zoom: Rebecca Schneider
Board Members Absent: Chair Pete Angie
Quorum Present
Applicants Present on Zoom: Scott Howard, Tina Nieuwendyk
Town Staff Present: Niels Tygesen, Mollie Duell
Town Board Present: Michael Boggs
Proceedings
Vice Chair Linda Liddle called the meeting to order at 7:01 PM at Town Hall.
Approval of Agenda
Motion: Klein motioned to appoint Klankowski as a voting member for the duration of the meeting;
Gragg seconded.
Vote: Liddle, aye; Gragg, aye; Klein, aye; Schneider, aye.
Motion Carried.
Approval of Past Minutes
Approval of the March 19 meeting minutes was postponed.
Privilege of the Floor
No members of the public addressed the Board pertaining to items not on the agenda.
New Business Items
SPR2403-01: Nieuwendyk Accessory Structure Sketch Plan Review
The applicant, Lee Dresser, on behalf of the owners, Tina and Joe Nieuwendyk, proposes to construct a
new detached accessory building approximately 576sf with a covered 8’ deep patio. Per the Code of the
Town of Ulysses UTC 212-44.A.1, accessory buildings are permitted in the LS zone subject to the
provisions of CTU 212-167, but require site plan review when within a slope overlay area, pursuant to
the provisions listed under CTU 212-19.
Tina Nieuwendyk stated that the purpose of the building was to store lawn and gardening tools and
there will be a porch area, but the building has been designed to not look too much like a garage.
Gragg asked if the new structure could store vehicles in the future; Nieuwendyk responded no, there is
already a garage for vehicles.
Schneider noted the design includes windows and asked if there were any plans for a sewer line, lights,
or other utilities; Nieuwendyk responded no.
Liddle asked about plans for stormwater drainage.
Nieuwendyk explained that there is a drainage system already in place for the home and other existing
structures, and the new structure will be incorporated into this. Gragg asked what the tie in will be like;