Loading...
HomeMy WebLinkAbout1997-08-21 - CM Master Plan Committee, 9/21 /97 — DRAFT 110 Page 1 Town of Ulysses Comprehensive Plan Committee Meeting August 21 , 1997 Present: Doug Austic, Greg Hoffmire, Catherine Stover, David Tyler, Robert Weatherby, Peter Penniman, Ruth Kahn, Caroline Duddleston, and Sue Poelvoorde . Recording minutes : Debra Austic . The meeting came to order at 7 : 15 p . m. . At a previous meeting it was decided that an introduction and executive summary should be written as a start toward information for a public hearing. An executive summary written by Alex was handed out. Doug showed a map sent by the county with individual parcels demarcated that could be used for the report. The map could be copied , reduced, enlarged or put on mylar according to the committee ' s needs . Doug also pointed out two binders Alex had been keeping with copies of minutes, surveys (water, sewer, transportation, etc . ) that could be used in the report. The general feeling was that these should be appendices . Catherine asked what else was needed for a packet for the public other than the introduction, executive summary, and map . Dave mentioned the basic document should be 40-50 pages . Reports and chapters written previously were mentioned and the Committee thought Alex could organize it into a single document. Other information could be available if anyone wanted to look at it . Sue mentioned an already existing outline to follow which included : 1 ) Introduction 2) Goals and objectives 3 ) The plan and implementation 4) SEQRA Peter will bring in copies of documents from Rochester as examples of master plan format. Sue recommended to make copies appendix information available at library and town hall . She said the town would have to provide a copy of entire document if someone requests . There was discussion of SEQRA, environmental review and adoption of the plan . Sue mentioned that Town could do a negative declaration — no impact — but it should be part of the document. Dave said SEQRA would be tougher for the zoning change . Doug thought there was a change a few years ago there was a SEQRA for the comprehensive plan it didn ' t need to be done every time . He will check on that. Sue said the implementation chapter will be important to spell out mechanisms to be used (like site plan review) and should be in place before doing the SEQRA . SEQRA could be presented at the public hearings . Group was happy with format of outline mentioned. What followed was a discussion of the executive summary and grammatical editing . Content changes included on page 1 , paragraph 3 , Dave clarified that the Town Board, not the Planning Board, designated the comprehensive planning committee . In reference to Issue # 8 on page 2 , Dave disagreed with the statement "existing zoning regulations for single and two family houses are adequate . Other current allowable uses in the residence zone should be reviewed" with regard to development issues . Discussion about how zoning could used to address the issue of subdivision of a larger parcel and cottage industries and allowable use occurred . The statement was then changed to read "subdivision regulations and non-residential activities in residential activities in residential zones should be reviewed . " The group noted that Alex had done a good job of capturing the essence of what the committee is trying to do . The next meeting of the Master Plan Committee is scheduled for September 4th at 7p .m . if Alex can get something done to look at. Sue also mentioned it would be easier to have copies to read over before the meeting . Sue and Doug will not be present on the 4th .