Current folder
All folders
Advanced
My WebLink
More
Help
About
Sign Out
No results found
No entry selected.
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
Standard Installtion Details Rev 3
02_TOC_Network Connectivity_Phase 3B_v3
04 22 00 - Concrete Unit Masonry
06 10 00 - Rough Carpentry
07 81 00 - Applied Fireproofing
07 84 13 - Penetration Firestopping
08 11 13 - Hollow Metal Doors and Frames
08 14 16 - Flush Wood Doors
08 31 13 - Access Doors and Frames
09 22 16 - Non-Structural Metal Framing
09 29 00 - Gypsum Board
09 65 36 - Resilient Tile Flooring
09 65 37 - Anti-Static Resilient Tile Flooring
09 91 23 - Interior Painting
10 22 13 - Wire Mesh Partitions
21 13 13 - Wet-Pipe Sprinkler Systems
21 13 16 - Dry-Pipe Sprinkler Systems
23 01 00 - Mechanical Basic Materials and Methods
23 01 01 - HVAC General Provisions
23 05 93 - Testing Adjusting and Balancing
23 07 13 - Duct Insulation
23 07 19 - HVAC Piping Insulation
23 21 13 - Hydronic Piping
23 21 23 - Hydronic Pumps
23 23 00 - Refrigerant Piping
23 31 13 - Metal Ducts
23 33 16 - Fire Dampers
23 34 16 - Centrifugal HVAC Fans
23 37 13 - Diffusers Registers and Grilles
23 81 26 - Split-System Air Conditioners
23 82 19 - Fan Coil Units
26 01 00 - Electrical General Provisions
26 01 01 - Basic Materials and Methods
26 05 26 - Grounding
26 05 53 - Electrical Equipment Identification
26 29 10 - Motor Starters and Disconnects
26 51 00 - Lighting
26 60 00 - Fire Alarm System Improvements
27 05 00 - Basic Communications Requirements
27 05 28 - Communications System Pathways
27 11 00 - Telecommunication Rooms and Spaces
27 13 00 - Backbone Cabling
27 15 00 - Horizontal Requirements
28 07 10 - Security Management System
28 13 00 - Access Control
AT-27052851
CU-NCP Phase 3B Project Manual
Rockefeller Hall
Rockefeller Hall Drawings
ROCKEFELLER_2014-CD-FNL-FOR STAMP