Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
Permit #30958
02_TOC_Network Connectivity_Phase 3A_v3
03_INS_Phase 3A_Network Connectivity_FINAL_NP
04 22 00 - Concrete Unit Masonry
04_BF_Phase 3A_Network Connectivity_FINAL_NP
05_GCs_Phase 3A_Network Connectivity_FINAL_NP
06 10 00 - Rough Carpentry
06_GRs_Phase 3A_Network Connectivity_FINAL_NP
07 81 00 - Applied Fireproofing
07 84 13 - Penetration Firestopping
08 11 13 - Hollow Metal Doors and Frames
08 14 16 - Flush Wood Doors
08 31 13 - Access Doors and Frames
09 22 16 - Non-Structural Metal Framing
09 29 00 - Gypsum Board
09 65 36 - Resilient Tile Flooring
09 65 37 - Anti-Static Resilient Tile Flooring
09 91 23 - Interior Painting
10 22 13 - Wire Mesh Partitions
20121102 CCC_CDs_Combined and Stamped
20121102-Uris Hall_CDs_Combined and Stamped
21 13 13 - Wet-Pipe Sprinkler Systems
21 13 16 - Dry-Pipe Sprinkler Systems
23 01 00 - Mechanical Basic Materials and Methods
23 01 01 - HVAC General Provisions
23 05 93 - Testing Adjusting and Balancing
23 07 13 - Duct Insulation
23 07 19 - HVAC Piping Insulation
23 21 13 - Hydronic Piping
23 21 23 - Hydronic Pumps
23 23 00 - Refrigerant Piping
23 31 13 - Metal Ducts
23 33 16 - Fire Dampers
23 34 16 - Centrifugal HVAC Fans
23 37 13 - Diffusers Registers and Grilles
23 81 26 - Split-System Air Conditioners
23 82 19 - Fan Coil Units
26 01 00 - Electrical General Provisions
26 01 01 - Basic Materials and Methods
26 05 26 - Grounding
26 05 53 - Electrical Equipment Identification
26 29 10 - Motor Starters and Disconnects
26 51 00 - Lighting
26 60 00 - Fire Alarm System Improvements
27 05 00 - Basic Communications Requirements
27 05 28 - Communications System Pathways
27 11 00 - Telecommunication Rooms and Spaces
27 13 00 - Backbone Cabling
27 15 00 - Horizontal Requirements
28 07 10 - Security Management System
28 13 00 - Access Control
AT-07841302
CCC---AMEP-1A
CU-27052601
CU-NCP Phase 3A Project Manual
CU-NCP Standard Installtion Details Rev 3
Rev 3 Standard Technical Spec's Combined
Uris Hall
URIS HALL SELECTIVE STRUCTURE DEMOLITION